Datacenter regulatory-trace changes as of August 5, 2026

As of 2026-08-05, 4 of the 57 tracked announced sites had a changed phantom score, or entered the baseline, in this published comparison.

Compared with the immediately preceding sealed source report dated 2026-08-04. The score reports how much trace was observed in bounded public air-permit and FAA airspace sources. A higher score is a diligence prompt, not a verdict about whether a datacenter will be built.

710permit applications in the source snapshot
25,895non-terminal FAA cases observed nationally
8.0 kmfixed airspace join radius

Sites that define this dated page

Announced sitePrior scoreCurrent scoreObserved trace
Google Goodnight Campus (acquired from Crusoe)
Google (developed by Crusoe) · Claude, Armstrong County, TX
4530air-permit match x2; technically-complete stage; stagnant application >187d still administrative
Stargate Abilene (Crusoe/Lancium campus)
OpenAI/Oracle/Crusoe · Abilene, TX
4530air-permit match x2; technically-complete stage; stagnant application >187d still administrative
Stargate Milam County (SB Energy)
OpenAI/SB Energy (SoftBank) · Rockdale/Milam County, TX
4530air-permit match x2; technically-complete stage; stagnant application >187d still administrative
Stargate Shackelford County (Vantage Frontier)
OpenAI/Oracle/Vantage · Shackelford County, TX
4530air-permit match x2; technically-complete stage; stagnant application >187d still administrative

Rows not shown retained the same score and are intentionally omitted. That keeps this page about what changed instead of reproducing a 57-row table every day. Score bands are heuristic and depend on coverage: TCEQ pending applications cover Texas, while the FAA case layer is national. An issued permit, a local permit outside the collected sources, or construction that needs no sampled FAA filing can all be absent from this view.

Method, source, and content seal

The August 5, 2026 comparison is derived from public records published by TCEQ and the FAA Part 77 archive. The scorer joins those bounded records to publicly announced site locations. Name-token matches that are merely contextual do not count as direct permit evidence. Distance matches use the fixed radius shown above. The method does not infer power, capacity, financing, completion, or operator intent.

The August 5, 2026 source artifact reproduced its declared SHA-256 seal before this response was rendered. The seal excludes only the machine-local database path; dates, source counts, site rows, scores, and reasons remain bound.

SHA-256: 8a340b77c682e9c2ee8c54c86f7884ba8370f6be15e6917a4cbbdfd03949118f