Datacenter regulatory-trace changes as of August 21, 2026
As of 2026-08-21, 9 of the 57 tracked announced sites had a changed phantom score, or entered the baseline, in this published comparison.
Compared with the immediately preceding sealed source report dated 2026-08-20. The score reports how much trace was observed in bounded public air-permit and FAA airspace sources. A higher score is a diligence prompt, not a verdict about whether a datacenter will be built.
Sites that define this dated page
| Announced site | Prior score | Current score | Observed trace |
|---|---|---|---|
| AWS Richmond County Campus (Energy Way Industrial Park) Amazon · Hamlet, Richmond County, NC | 50 | 30 | FAA cases within 8.0km x1 |
| Google Columbus Data Center Google · Columbus, OH | 50 | 20 | FAA cases within 8.0km x3; active construction (0 crane cases) |
| Google Kansas City (East) Google · Kansas City, MO | 30 | 20 | FAA cases within 8.0km x3; active construction (1 crane cases) |
| Google Mesa Data Center Google · Mesa, AZ | 20 | 50 | No bounded trace observed |
| Google West Memphis Campus (Groot LLC) Google · West Memphis, AR | 30 | 20 | FAA cases within 8.0km x1; active construction (1 crane cases) |
| QTS Richmond (White Oak) Campus QTS · Sandston, Henrico County, VA | 50 | 20 | FAA cases within 8.0km x3; active construction (2 crane cases) |
| Stargate Abilene (Crusoe/Lancium campus) OpenAI/Oracle/Crusoe · Abilene, TX | 30 | 0 | air-permit match x2; technically-complete stage; stagnant application >203d still administrative; FAA cases within 8.0km x1; active construction (1 crane cases) |
| Stargate Milam County (SB Energy) OpenAI/SB Energy (SoftBank) · Rockdale/Milam County, TX | 30 | 10 | air-permit match x2; technically-complete stage; stagnant application >203d still administrative; FAA cases within 8.0km x1 |
| Stargate Project Jupiter (STACK/BorderPlex) OpenAI/Oracle/STACK Infrastructure · Santa Teresa, Doña Ana County, NM | 20 | 30 | FAA cases within 8.0km x1 |
Rows not shown retained the same score and are intentionally omitted. That keeps this page about what changed instead of reproducing a 57-row table every day. Score bands are heuristic and depend on coverage: TCEQ pending applications cover Texas, while the FAA case layer is national. An issued permit, a local permit outside the collected sources, or construction that needs no sampled FAA filing can all be absent from this view.
Method, source, and content seal
The August 21, 2026 comparison is derived from public records published by TCEQ and the FAA Part 77 archive. The scorer joins those bounded records to publicly announced site locations. Name-token matches that are merely contextual do not count as direct permit evidence. Distance matches use the fixed radius shown above. The method does not infer power, capacity, financing, completion, or operator intent.
The August 21, 2026 source artifact reproduced its declared SHA-256 seal before this response was rendered. The seal excludes only the machine-local database path; dates, source counts, site rows, scores, and reasons remain bound.