Interconnection queue › Arkansas › Mississippi County
Snapshot of 2026-08-06 · 26 projects · Arkansas (AR)
There are 26 projects in the interconnection queue located in Mississippi County, Arkansas (AR), totalling 4,260 MW across the 26 that publish a capacity.
Get told what moves in Mississippi County, Arkansas
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Mississippi County, Arkansas: what entered, what moved study phase, what came off the list.
Email me Mississippi County, Arkansas queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| MISO | 26 | 4,260 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 13 | 2,590 MW |
| Hybrid | 6 | 1,655 MW |
| Battery Storage | 5 | 0 MW |
| Coal | 1 | 15 MW |
| Wind | 1 | 0 MW |
| Status | Projects | Capacity |
|---|---|---|
| Withdrawn | 10 | 15 MW |
| Done | 10 | 2,940 MW |
| Active | 6 | 1,305 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| DELL EHV - SAN SOUCI 500.0kV | MISO | 500 | Done | 2021-12-14 | 2024-08-15 |
| DELL EHV - SAN SOUCI 500.0kV | MISO | 500 | Done | 2021-12-22 | 2024-08-15 |
| DELL EHV - SAN SOUCI 500.0kV | MISO | 500 | Done | 2021-08-24 | 2024-08-15 |
| Sandy Bayou | MISO | 500 | Active | 2022-09-15 | 2027-04-15 |
| DELL EHV - SAN SOUCI 500.0kV | MISO | 500 | Active | 2024-04-18 | 2028-09-02 |
| Sandy Bayou | MISO | 440 | Done | 2021-11-30 | 2026-04-15 |
| Dell to Nucor 161 kV | MISO | 250 | Done | 2021-08-10 | 2024-05-01 |
| BLYTHEVILLE I-55 - AECC BLYTHEVILLE NORTH 161.0kV | MISO | 200 | Done | 2020-06-12 | 2023-09-01 |
| Line tap DELL to Manilla AECC 161 kV | MISO | 200 | Done | 2021-11-23 | 2024-10-31 |
| 161 kV line tap of DELL EAST to Blytheville | MISO | 200 | Done | 2022-07-13 | 2024-10-31 |
| MONETTE JUNCTION - PARAGOULD 161.0kV | MISO | 150 | Active | 2024-04-16 | 2028-09-30 |
| Driver 203kV Substation | MISO | 100 | Done | 2021-12-08 | 2023-08-31 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| MISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.