Interconnection queueIllinois › Solar

Solar Projects in the Illinois Interconnection Queue

Snapshot of 2026-07-30 · 214 projects

214 solar projects are in the interconnection queue with a Illinois location, totalling 19,943 MW across the 214 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in Illinois

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Illinois: what entered, what moved study phase, what came off the list.

Email me solar in Illinois queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO21419,943 MW

By status, as published

StatusProjects
Withdrawn107
Active66
Done38
Pending Revision Approval2
Pending Transfer1

Top counties

CountyProjectsCapacity
Perry91,207 MW
Scott9833 MW
Vermilion8385 MW
Clay6525 MW
Fulton61,001 MW
Fayette6803 MW
Washington County6335 MW
Sangamon5470 MW
Mason5320 MW
Jasper5597 MW
Christian5690 MW
Johnson4600 MW
Iroquois4589 MW
Cumberland4400 MW
Saline County4460 MW

Where each number came from

ISOWe last readSource last changedSource
MISO2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.