Interconnection queueIllinois › Wind

Wind Projects in the Illinois Interconnection Queue

Snapshot of 2026-07-30 · 100 projects

100 wind projects are in the interconnection queue with a Illinois location, totalling 12,929 MW across the 100 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in wind in Illinois

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in wind in Illinois: what entered, what moved study phase, what came off the list.

Email me wind in Illinois queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO10012,929 MW

By status, as published

StatusProjects
Withdrawn41
Active41
Done17
Pending Revision Approval1

Top counties

CountyProjectsCapacity
McLean81,348 MW
Vermilion6350 MW
Shelby5550 MW
Peoria51,300 MW
Champaign4288 MW
Tazewell4575 MW
Mason4400 MW
Iroquois4789 MW
McDonough3416 MW
Mason County3350 MW
Morgan County3550 MW
Christian County3420 MW
Piatt County3300 MW
McLean County2250 MW
Knox County2147 MW

Where each number came from

ISOWe last readSource last changedSource
MISO2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.