Wind Projects in the Indiana Interconnection Queue

Snapshot of 2026-07-30 · 38 projects

38 wind projects are in the interconnection queue with a Indiana location, totalling 3,581 MW across the 38 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in wind in Indiana

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in wind in Indiana: what entered, what moved study phase, what came off the list.

Email me wind in Indiana queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO383,581 MW

By status, as published

StatusProjects
Withdrawn27
Active5
Done5
Pending Revision Approval1

Top counties

CountyProjectsCapacity
Benton3200 MW
Montgomery County3496 MW
Vermillion20 MW
Henry County20 MW
Miami County20 MW
Jasper County,Pulaski County2400 MW
White County2300 MW
Gibson County2400 MW
White20 MW
Clinton2380 MW
Montgomery2250 MW
Newton2275 MW
Tippecanoe1200 MW
Carroll County,White County10 MW
Clinton County1200 MW

Where each number came from

ISOWe last readSource last changedSource
MISO2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.