Interconnection queueKentucky › Solar

Solar Projects in the Kentucky Interconnection Queue

Snapshot of 2026-07-30 · 37 projects

37 solar projects are in the interconnection queue with a Kentucky location, totalling 2,632 MW across the 37 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in Kentucky

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Kentucky: what entered, what moved study phase, what came off the list.

Email me solar in Kentucky queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO372,632 MW

By status, as published

StatusProjects
Withdrawn23
Done8
Active5
Pending Revision Approval1

Top counties

CountyProjectsCapacity
Henderson13600 MW
Daviess3200 MW
Graves2200 MW
McCracken260 MW
Breckinridge2100 MW
Henderson County2250 MW
Webster2160 MW
Breckinridge County1100 MW
Hopkins145 MW
Lyon County1125 MW
Caldwell County1150 MW
Webster County1150 MW
Meade County1200 MW
Meade10 MW
Caldwell10 MW

Where each number came from

ISOWe last readSource last changedSource
MISO2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.