Interconnection queueMichigan › Hybrid

Hybrid Projects in the Michigan Interconnection Queue

Snapshot of 2026-07-30 · 22 projects

22 hybrid projects are in the interconnection queue with a Michigan location, totalling 2,069 MW across the 22 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in hybrid in Michigan

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in hybrid in Michigan: what entered, what moved study phase, what came off the list.

Email me hybrid in Michigan queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO222,069 MW

By status, as published

StatusProjects
Withdrawn13
Active7
Done2

Top counties

CountyProjectsCapacity
Montcalm3340 MW
Ogemaw20 MW
St. Clair1200 MW
Huron1200 MW
Calhoun1499 MW
Barry1150 MW
Monroe10 MW
Livingston1250 MW
Lenawee1110 MW
Ionia1150 MW
Baraga10 MW
Houghton10 MW
Van Buren10 MW
Allegan1170 MW
Otsego10 MW

Where each number came from

ISOWe last readSource last changedSource
MISO2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.