Interconnection queueMichigan › Solar

Solar Projects in the Michigan Interconnection Queue

Snapshot of 2026-07-30 · 247 projects

247 solar projects are in the interconnection queue with a Michigan location, totalling 20,239 MW across the 247 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in Michigan

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Michigan: what entered, what moved study phase, what came off the list.

Email me solar in Michigan queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO24720,239 MW

By status, as published

StatusProjects
Withdrawn120
Active64
Done41
Pending Revision Approval21
LEGACY: Done1

Top counties

CountyProjectsCapacity
Bay11385 MW
Saginaw8845 MW
Sanilac81,120 MW
Monroe7385 MW
Midland7304 MW
Livingston6445 MW
Washtenaw County6559 MW
Shiawassee County6729 MW
Dickinson6142 MW
Tuscola5405 MW
Hillsdale5470 MW
Lenawee5175 MW
Mason5658 MW
Eaton County5250 MW
Calhoun County5674 MW

Where each number came from

ISOWe last readSource last changedSource
MISO2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.