Solar Projects in the Mississippi Interconnection Queue

Snapshot of 2026-07-30 · 121 projects

121 solar projects are in the interconnection queue with a Mississippi location, totalling 5,606 MW across the 121 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in Mississippi

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Mississippi: what entered, what moved study phase, what came off the list.

Email me solar in Mississippi queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO1215,606 MW

By status, as published

StatusProjects
Withdrawn91
Done14
Active11
Pending Revision Approval5

Top counties

CountyProjectsCapacity
Sunflower12530 MW
Madison9407 MW
Hinds6150 MW
Washington50 MW
Coahoma50 MW
Tunica5160 MW
Holmes5225 MW
Perry4250 MW
Leflore4400 MW
Panola40 MW
Amite40 MW
Hinds County40 MW
Bolivar4260 MW
Lincoln30 MW
Washington County3200 MW

Where each number came from

ISOWe last readSource last changedSource
MISO2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.