Interconnection queueNorth Dakota › Solar

Solar Projects in the North Dakota Interconnection Queue

Snapshot of 2026-07-30 · 19 projects

19 solar projects are in the interconnection queue with a North Dakota location, totalling 1,792 MW across the 19 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in North Dakota

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in North Dakota: what entered, what moved study phase, what came off the list.

Email me solar in North Dakota queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO191,792 MW

By status, as published

StatusProjects
Withdrawn14
Active4
Done1

Top counties

CountyProjectsCapacity
Cass4600 MW
Cass County4260 MW
Emmons485 MW
Mercer10 MW
McIntosh County10 MW
LaMoure County10 MW
Morton10 MW
Sheridan1100 MW
Barnes1500 MW
Stutsman1247 MW

Where each number came from

ISOWe last readSource last changedSource
MISO2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.