Interconnection queue › Louisiana › Beauregard Parish
Snapshot of 2026-08-06 · 25 projects · Louisiana (LA)
There are 25 projects in the interconnection queue located in Beauregard Parish, Louisiana (LA), totalling 319 MW across the 25 that publish a capacity.
Get told what moves in Beauregard Parish, Louisiana
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Beauregard Parish, Louisiana: what entered, what moved study phase, what came off the list.
Email me Beauregard Parish, Louisiana queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| MISO | 25 | 319 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 14 | 319 MW |
| Hybrid | 6 | 0 MW |
| Battery Storage | 5 | 0 MW |
| Status | Projects | Capacity |
|---|---|---|
| Withdrawn | 22 | 179 MW |
| Active | 3 | 140 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Cole - Cooper 230.0kV | MISO | 140 | Active | 2025-10-03 | 2029-09-06 |
| Deridder - Centennial 138-kV | MISO | 99 | Withdrawn | 2021-08-17 | 2023-10-31 |
| Nelson (EES) - Longville 138kV | MISO | 80 | Withdrawn | 2021-08-11 | 2024-03-01 |
| Cooper Switching - Penton Road 230 kV | MISO | 0 | Withdrawn | 2020-06-25 | 2022-03-01 |
| COOPER SWITCHING - PENTON ROAD 230 KV | MISO | 0 | Withdrawn | 2020-06-25 | 2022-03-01 |
| CLECO Cooper-Penton Road 230kV Line | MISO | 0 | Withdrawn | 2021-08-10 | 2024-09-01 |
| Rhodes | MISO | 0 | Withdrawn | 2021-09-09 | 2024-04-30 |
| West Bay - Centennial 138 kV | MISO | 0 | Withdrawn | 2022-09-15 | 2026-10-31 |
| Bon Wier to Cooper 138 kV | MISO | 0 | Withdrawn | 2022-09-15 | 2026-10-31 |
| Bon Wier to Cooper 138 kV | MISO | 0 | Withdrawn | 2022-09-15 | 2026-10-31 |
| West Bay - Centennial 138 kV | MISO | 0 | Withdrawn | 2022-09-15 | 2026-10-31 |
| Singer J1424 to Penton 230 kV line | MISO | 0 | Withdrawn | 2022-09-15 | 2025-10-31 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| MISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.