Interconnection queue › Louisiana
Snapshot of 2026-07-30 · 396 projects · MISO, SPP
There are 396 projects in the interconnection queue with a Louisiana location, totalling 23,731 MW across the 396 that publish a capacity.
Get told what moves in Louisiana
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Louisiana: what entered, what moved study phase, what came off the list.
Email me Louisiana queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| MISO | 386 | 20,886 MW |
| SPP | 10 | 2,845 MW |
Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 226 | 15,331 MW |
| Battery Storage | 74 | 1,096 MW |
| Hybrid | 51 | 2,672 MW |
| Gas | 21 | 2,993 MW |
| (not published) | 11 | 609 MW |
| Wind | 6 | 536 MW |
| Waste Heat Recovery | 2 | 31 MW |
| Solar/Storage | 2 | 205 MW |
| Hydro | 1 | 0 MW |
| Nuclear | 1 | 60 MW |
| Battery | 1 | 199 MW |
| County | Projects | Capacity |
|---|---|---|
| Beauregard | 25 | 319 MW |
| Morehouse | 25 | 1,475 MW |
| Calcasieu | 17 | 975 MW |
| Washington | 13 | 550 MW |
| Jefferson Davis | 13 | 1,055 MW |
| Rapides | 12 | 980 MW |
| Acadia | 12 | 689 MW |
| Ouachita | 12 | 1,430 MW |
| Sabine | 11 | 1,054 MW |
| Iberville | 11 | 425 MW |
| Webster | 9 | 0 MW |
| Evangeline | 9 | 680 MW |
| Concordia | 8 | 200 MW |
| St. Landry | 8 | 1,118 MW |
| Tangipahoa | 7 | 380 MW |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| MISO | 2026-07-30 | 2026-07-30 | source file |
| SPP | 2026-07-30 | 2026-07-30 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.