Interconnection queue › Louisiana › Morehouse Parish
Snapshot of 2026-08-06 · 25 projects · Louisiana (LA)
There are 25 projects in the interconnection queue located in Morehouse Parish, Louisiana (LA), totalling 1,475 MW across the 25 that publish a capacity.
Get told what moves in Morehouse Parish, Louisiana
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Morehouse Parish, Louisiana: what entered, what moved study phase, what came off the list.
Email me Morehouse Parish, Louisiana queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| MISO | 25 | 1,475 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 13 | 1,035 MW |
| Battery Storage | 6 | 0 MW |
| Hybrid | 4 | 260 MW |
| Wind | 1 | 180 MW |
| Gas | 1 | 0 MW |
| Status | Projects | Capacity |
|---|---|---|
| Withdrawn | 17 | 0 MW |
| Active | 6 | 1,190 MW |
| Done | 2 | 285 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV | MISO | 300 | Active | 2024-04-13 | 2028-09-01 |
| DUNN - OAK RIDGE (LA) 115.0kV | MISO | 250 | Active | 2022-09-14 | 2026-10-31 |
| OAK RIDGE (LA) - SWARTZ 115.0kV | MISO | 200 | Active | 2024-04-16 | 2028-09-01 |
| CROSSETT NORTH - BEEKMAN 115.0kV | MISO | 195 | Done | 2021-11-30 | 2025-01-01 |
| OAK GROVE 115 SUB | MISO | 180 | Active | 2022-09-15 | 2025-10-01 |
| Taping the 'Galion / 3GALION (337444)' to 'Oak Grove / 3OAK_GROVE! (337445)' 115kV line | MISO | 160 | Active | 2022-09-15 | 2026-06-30 |
| Galion 115 kV Substation | MISO | 100 | Active | 2022-09-15 | 2027-03-01 |
| bastrop tap point | MISO | 90 | Done | 2021-10-20 | 2023-10-31 |
| Crossett North to North Bastrop 115 kV | MISO | 0 | Withdrawn | 2020-06-22 | 2024-01-15 |
| Crossett North to North Bastrop 115 kV | MISO | 0 | Withdrawn | 2020-06-22 | 2024-01-15 |
| Bastrop Tap 115kV | MISO | 0 | Withdrawn | 2021-08-24 | 2025-10-01 |
| Bastrop Tap 115kV | MISO | 0 | Withdrawn | 2021-08-26 | 2025-10-01 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| MISO | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.