Interconnection queueLouisiana › Morehouse Parish

Morehouse Parish, Louisiana Interconnection Queue

Snapshot of 2026-08-06 · 25 projects · Louisiana (LA)

There are 25 projects in the interconnection queue located in Morehouse Parish, Louisiana (LA), totalling 1,475 MW across the 25 that publish a capacity.

Get told what moves in Morehouse Parish, Louisiana

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Morehouse Parish, Louisiana: what entered, what moved study phase, what came off the list.

Email me Morehouse Parish, Louisiana queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO251,475 MW

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
Solar131,035 MW
Battery Storage60 MW
Hybrid4260 MW
Wind1180 MW
Gas10 MW

By status, as published

StatusProjectsCapacity
Withdrawn170 MW
Active61,190 MW
Done2285 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV
ID J3454
MISO300Active2024-04-132028-09-01
DUNN - OAK RIDGE (LA) 115.0kV
ID J2371
MISO250Active2022-09-142026-10-31
OAK RIDGE (LA) - SWARTZ 115.0kV
ID J3601
MISO200Active2024-04-162028-09-01
CROSSETT NORTH - BEEKMAN 115.0kV
ID J1851
MISO195Done2021-11-302025-01-01
OAK GROVE 115 SUB
ID J2965
MISO180Active2022-09-152025-10-01
Taping the 'Galion / 3GALION (337444)' to 'Oak Grove / 3OAK_GROVE! (337445)' 115kV line
ID J3118
MISO160Active2022-09-152026-06-30
Galion 115 kV Substation
ID J2956
MISO100Active2022-09-152027-03-01
bastrop tap point
ID J1827
MISO90Done2021-10-202023-10-31
Crossett North to North Bastrop 115 kV
ID J1545
MISO0Withdrawn2020-06-222024-01-15
Crossett North to North Bastrop 115 kV
ID J1551
MISO0Withdrawn2020-06-222024-01-15
Bastrop Tap 115kV
ID J1933
MISO0Withdrawn2021-08-242025-10-01
Bastrop Tap 115kV
ID J2011
MISO0Withdrawn2021-08-262025-10-01

Where each number came from

ISOWe last readSource last changedSource
MISO2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.