Interconnection queueArkansas › Hybrid

Hybrid Projects in the Arkansas Interconnection Queue

Snapshot of 2026-07-30 · 67 projects

67 hybrid projects are in the interconnection queue with a Arkansas location, totalling 5,922 MW across the 67 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in hybrid in Arkansas

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in hybrid in Arkansas: what entered, what moved study phase, what came off the list.

Email me hybrid in Arkansas queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO655,652 MW
SPP2270 MW

By status, as published

StatusProjects
Withdrawn39
Active20
Done5
Pending Revision Approval1
ERAS1
None1

Top counties

CountyProjectsCapacity
Craighead6250 MW
Mississippi61,655 MW
Cross40 MW
Lonoke4120 MW
Poinsett4100 MW
Crittenden4550 MW
Phillips3200 MW
Jefferson3600 MW
Lee3340 MW
Pulaski20 MW
White2100 MW
Grant2500 MW
Ouachita2130 MW
Arkansas2200 MW
St. Francis280 MW

Where each number came from

ISOWe last readSource last changedSource
MISO2026-07-302026-07-30 (changed this snapshot)source file
SPP2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.