Interconnection queueMinnesota › Solar

Solar Projects in the Minnesota Interconnection Queue

Snapshot of 2026-07-30 · 124 projects

124 solar projects are in the interconnection queue with a Minnesota location, totalling 9,811 MW across the 124 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in Minnesota

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Minnesota: what entered, what moved study phase, what came off the list.

Email me solar in Minnesota queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO1249,811 MW

By status, as published

StatusProjects
Withdrawn72
Active33
Done17
Pending Revision Approval2

Top counties

CountyProjectsCapacity
Polk6150 MW
Mower6732 MW
Olmsted4500 MW
Sherburne3272 MW
Benton3100 MW
Watonwan30 MW
McLeod3241 MW
Faribault3300 MW
Benton County3280 MW
Pipestone3325 MW
Renville3125 MW
Redwood3441 MW
Clay3920 MW
Stevens2295 MW
Itasca20 MW

Where each number came from

ISOWe last readSource last changedSource
MISO2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.