Snapshot of 2026-07-30 · 287 projects · MISO, SPP
There are 287 projects in the interconnection queue with a Minnesota location, totalling 22,180 MW across the 287 that publish a capacity.
Get told what moves in Minnesota
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Minnesota: what entered, what moved study phase, what came off the list.
Email me Minnesota queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| MISO | 284 | 22,109 MW |
| SPP | 3 | 70 MW |
Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 124 | 9,811 MW |
| Battery Storage | 69 | 4,480 MW |
| Wind | 60 | 6,139 MW |
| Hybrid | 12 | 1,618 MW |
| (not published) | 12 | 65 MW |
| Gas | 5 | 61 MW |
| Hydro | 3 | 4 MW |
| Diesel | 2 | 2 MW |
| County | Projects | Capacity |
|---|---|---|
| Mower | 11 | 732 MW |
| Olmsted | 10 | 1,230 MW |
| Dakota | 9 | 889 MW |
| Polk | 8 | 150 MW |
| Goodhue | 8 | 1,070 MW |
| Redwood | 8 | 792 MW |
| Chisago | 7 | 400 MW |
| Benton | 6 | 599 MW |
| Lyon | 6 | 935 MW |
| Cottonwood | 5 | 400 MW |
| Renville | 5 | 325 MW |
| Murray | 5 | 780 MW |
| Sherburne | 5 | 307 MW |
| Faribault | 5 | 450 MW |
| Cottonwood County | 5 | 337 MW |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| MISO | 2026-07-30 | 2026-07-30 | source file |
| SPP | 2026-07-30 | 2026-07-30 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.