Interconnection queue › Minnesota › Storage
Snapshot of 2026-07-30 · 69 projects
69 storage projects are in the interconnection queue with a Minnesota location, totalling 4,480 MW across the 69 that publish a capacity.
Get told what moves in storage in Minnesota
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in storage in Minnesota: what entered, what moved study phase, what came off the list.
Email me storage in Minnesota queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| MISO | 69 | 4,480 MW |
| Status | Projects |
|---|---|
| Withdrawn | 39 |
| Active | 26 |
| Pending Revision Approval | 3 |
| Done | 1 |
| County | Projects | Capacity |
|---|---|---|
| Dakota | 6 | 735 MW |
| Goodhue | 5 | 620 MW |
| Chisago | 4 | 250 MW |
| Olmsted | 4 | 550 MW |
| Mower | 3 | 0 MW |
| Redwood | 3 | 200 MW |
| Scott | 2 | 0 MW |
| Murray County | 2 | 20 MW |
| Wabasha | 2 | 450 MW |
| Freeborn | 2 | 150 MW |
| Washington | 2 | 80 MW |
| Benton | 2 | 250 MW |
| Polk | 2 | 0 MW |
| Otter Tail | 1 | 0 MW |
| Renville | 1 | 0 MW |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| MISO | 2026-07-30 | 2026-07-30 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.