Interconnection queueMinnesota › Storage

Storage Projects in the Minnesota Interconnection Queue

Snapshot of 2026-07-30 · 69 projects

69 storage projects are in the interconnection queue with a Minnesota location, totalling 4,480 MW across the 69 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in storage in Minnesota

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in storage in Minnesota: what entered, what moved study phase, what came off the list.

Email me storage in Minnesota queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO694,480 MW

By status, as published

StatusProjects
Withdrawn39
Active26
Pending Revision Approval3
Done1

Top counties

CountyProjectsCapacity
Dakota6735 MW
Goodhue5620 MW
Chisago4250 MW
Olmsted4550 MW
Mower30 MW
Redwood3200 MW
Scott20 MW
Murray County220 MW
Wabasha2450 MW
Freeborn2150 MW
Washington280 MW
Benton2250 MW
Polk20 MW
Otter Tail10 MW
Renville10 MW

Where each number came from

ISOWe last readSource last changedSource
MISO2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.