Wind Projects in the Minnesota Interconnection Queue

Snapshot of 2026-07-30 · 60 projects

60 wind projects are in the interconnection queue with a Minnesota location, totalling 6,139 MW across the 60 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in wind in Minnesota

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in wind in Minnesota: what entered, what moved study phase, what came off the list.

Email me wind in Minnesota queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO606,139 MW

By status, as published

StatusProjects
Withdrawn39
Active18
Done3

Top counties

CountyProjectsCapacity
Lyon4450 MW
Murray3630 MW
Lincoln County3110 MW
Big Stone2600 MW
Cottonwood2400 MW
Redwood County2614 MW
Jackson County,Martin County2105 MW
Faribault County20 MW
Nobles County20 MW
Cottonwood County20 MW
Redwood2151 MW
Freeborn2220 MW
Lac qui Parle2500 MW
St. Louis10 MW
Benton1249 MW

Where each number came from

ISOWe last readSource last changedSource
MISO2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.