Interconnection queue › Wisconsin › Gas
Snapshot of 2026-07-30 · 24 projects
24 gas projects are in the interconnection queue with a Wisconsin location, totalling 6,754 MW across the 24 that publish a capacity.
Get told what moves in gas in Wisconsin
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in gas in Wisconsin: what entered, what moved study phase, what came off the list.
Email me gas in Wisconsin queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| MISO | 24 | 6,754 MW |
| Status | Projects |
|---|---|
| Active | 15 |
| Withdrawn | 5 |
| Done | 4 |
| County | Projects | Capacity |
|---|---|---|
| Kenosha | 5 | 1,336 MW |
| Dane | 3 | 1,215 MW |
| Walworth | 3 | 1,274 MW |
| Rock | 2 | 305 MW |
| Ozaukee County | 1 | 48 MW |
| Rock County | 1 | 30 MW |
| Douglas County | 1 | 562 MW |
| Portage | 1 | 350 MW |
| Sheboygan | 1 | 150 MW |
| Green | 1 | 160 MW |
| Winnebago | 1 | 150 MW |
| Fond du Lac | 1 | 525 MW |
| Calumet | 1 | 650 MW |
| Columbia | 1 | 0 MW |
| Milwaukee | 1 | 0 MW |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| MISO | 2026-07-30 | 2026-07-30 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.