Interconnection queue › Wisconsin
Snapshot of 2026-07-30 · 247 projects · MISO
There are 247 projects in the interconnection queue with a Wisconsin location, totalling 27,117 MW across the 247 that publish a capacity.
Get told what moves in Wisconsin
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Wisconsin: what entered, what moved study phase, what came off the list.
Email me Wisconsin queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| MISO | 247 | 27,117 MW |
Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 121 | 14,016 MW |
| Battery Storage | 54 | 3,492 MW |
| Wind | 26 | 2,326 MW |
| Gas | 22 | 6,145 MW |
| (not published) | 14 | 0 MW |
| Hybrid | 7 | 529 MW |
| Combined Cycle | 2 | 610 MW |
| Compressed Air Storage | 1 | 0 MW |
| County | Projects | Capacity |
|---|---|---|
| Columbia | 20 | 2,353 MW |
| Portage | 15 | 2,245 MW |
| Kenosha | 9 | 1,836 MW |
| Dane | 8 | 1,540 MW |
| Waushara | 8 | 180 MW |
| Rock County | 7 | 694 MW |
| Wood | 7 | 450 MW |
| Walworth | 7 | 1,374 MW |
| Rock | 7 | 552 MW |
| St. Croix | 6 | 360 MW |
| Marathon | 5 | 369 MW |
| Barron | 5 | 433 MW |
| Walworth County | 5 | 200 MW |
| Green | 5 | 260 MW |
| Fond du Lac | 5 | 822 MW |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| MISO | 2026-07-30 | 2026-07-30 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.