Interconnection queueWisconsin › Solar

Solar Projects in the Wisconsin Interconnection Queue

Snapshot of 2026-07-30 · 121 projects

121 solar projects are in the interconnection queue with a Wisconsin location, totalling 14,016 MW across the 121 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in Wisconsin

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Wisconsin: what entered, what moved study phase, what came off the list.

Email me solar in Wisconsin queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO12114,016 MW

By status, as published

StatusProjects
Withdrawn54
Done42
Active25

Top counties

CountyProjectsCapacity
Columbia111,113 MW
Portage81,895 MW
Rock County6664 MW
Walworth County5200 MW
St. Croix4360 MW
Waushara480 MW
Trempealeau3137 MW
Jefferson County3424 MW
Kenosha County,Racine County31,200 MW
Jefferson3196 MW
Wood3450 MW
Green3100 MW
Walworth3100 MW
Barron3238 MW
Sheboygan3175 MW

Where each number came from

ISOWe last readSource last changedSource
MISO2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.