Hybrid Projects in the Louisiana Interconnection Queue

Snapshot of 2026-07-30 · 53 projects

53 hybrid projects are in the interconnection queue with a Louisiana location, totalling 2,877 MW across the 53 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in hybrid in Louisiana

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in hybrid in Louisiana: what entered, what moved study phase, what came off the list.

Email me hybrid in Louisiana queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
MISO512,672 MW
SPP2205 MW

By status, as published

StatusProjects
Withdrawn38
Active10
Done3
DISIS STAGE1
IA PENDING1

Top counties

CountyProjectsCapacity
Beauregard60 MW
Morehouse4260 MW
St. Tammany4450 MW
Calcasieu4400 MW
St. Helena3800 MW
West Carroll30 MW
Union20 MW
East Feliciana277 MW
Avoyelles20 MW
Acadia20 MW
Webster10 MW
St. James10 MW
Grant10 MW
Winn10 MW
Tangipahoa1120 MW

Where each number came from

ISOWe last readSource last changedSource
MISO2026-07-302026-07-30 (changed this snapshot)source file
SPP2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.