Energy and siting Queue changes 253,259 rows held

What the queue feed covers, and what it does not

Every operator we collect, the date of the newest copy we hold of each, what each of their files leaves blank, and the days we tried and came back with nothing.

Price
Not sold from this page
Built for
Energy researchers, journalists, interconnection-software vendors
Read
About every week
Newest sealed read
2026-07-30

Email us about the copies we holdNo card needed to ask. We reply with what we hold.

Newest sealed read: 2026-07-30. We read this source about every 7 days. We hold 31 sealed runs going back to 2026-06-11. Collection has paused on the part of this page that sets the date above it: ERCOT, last copy 30 Jul 2026, and we have not asked for it since; MISO, last copy 6 Aug 2026, and we have not asked for it since. The 5,642 of these 12,332 projects that sit in those lists stay exactly where they are. The other 6,690 come from CAISO, SPP, ISO-NE and NYISO, which we are still reading, and those are current to 29 Aug 2026. Read the date at the top as the date the whole page is complete to, because that is the oldest of them.

What this page is253,259 rows held · newest sealed read 2026-07-30

  • This feed holds 253,259 dated project rows across 6 operators, from 11 Jun 2026 to 29 Aug 2026. 34 collection runs produced those 31 dated copies — some days ran more than once, which is why the two numbers differ.
  • The picture on this page is complete only as of 30 Jul 2026. ERCOT has 1,839 of the 12,332 projects in this feed — 15% of them — and we have not been able to read that list since then. The rest of the page is current to 29 Aug 2026.
  • Every copy is dated, and every operator's own last read date is in the first table and at the top of its own page. A quiet operator is never rolled into a fresher date to make this feed look more current than it is.
  • Two days we tried and came back with nothing usable: on 13 Aug 2026 the SPP file came back at only 4,880 bytes, far short of a full list, and on 22 Aug 2026 the CAISO server answered with an error (503). We sealed no copy for either of those days. We would rather name the gap than quietly skip it.

Real rows out of our sealed copies

These are rows we read out of dated copies we keep ourselves. The live source shows today only, so once a row moves, what it said before is gone from the place you would go to look.

Every operator in this feed, the newest copy we hold of each, and how often the file changed against how often a project really moved 11 Jun 2026 to 29 Aug 2026
OperatorNewest copy we holdDated copies we holdProjects in that copyTimes the file came back differentTimes a project had actually moved
CAISO29 Aug 2026302,278289
SPP29 Aug 2026301,0272219
ISO-NE29 Aug 2026311,747297
NYISO29 Aug 2026281,63822
MISO6 Aug 2026103,80388
ERCOT30 Jul 202691,83900
12 of 666 moves we hold for this feed, newest first — the file you buy carries all but 99 of them. The 99 it leaves out are on the state pages we no longer sell, named lower down each row names its own two dates
ProjectOperatorWhereSizeWhat movedBetween
GEN-2026-SR32SPPSaint Joseph, MO400 MWin-service 15 Dec 2028 → 31 Dec 202826 Aug 2026 → 27 Aug 2026
GEN-2026-SR31SPPSaint Joseph, MO400 MWin-service 15 Dec 2028 → 31 Dec 202826 Aug 2026 → 27 Aug 2026
KINGSLEY SOLAR FARMCAISOIMPERIAL, CA360 MWstatus ACTIVE → WITHDRAWN26 Aug 2026 → 27 Aug 2026
ERAS-2025-001SPPLancaster, NE104 MWstatus ERAS → IA FULLY EXECUTED/ON SCHEDULE26 Aug 2026 → 27 Aug 2026
GEN-2017-198SPPOmaha, NE11.6 MWno longer in this file26 Aug 2026 → 27 Aug 2026
GEN-2023-037SPPWyandotte, KS200 MWstatus IA PENDING → IA FULLY EXECUTED/ON SCHEDULE24 Aug 2026 → 25 Aug 2026
GEN-2023-037SPPWyandotte, KS200 MWin-service 1 Jul 2028 → 30 Aug 202924 Aug 2026 → 25 Aug 2026
Nutes SolarISO-NEStrafford, NH20 MWin-service 22 Sep 2026 → 28 Sep 202624 Aug 2026 → 25 Aug 2026
GEN-2016-087SPPCampbell, SD98.6 MWsize 98.9 MW → 98.6 MW21 Aug 2026 → 22 Aug 2026
GEN-2016-087SPPCampbell, SD98.6 MWin-service 31 Dec 2026 → 31 Dec 202821 Aug 2026 → 22 Aug 2026
Twin Energy WindISO-NEOxford, ME18.3 MWin-service 6 Nov 2026 → 4 Dec 202619 Aug 2026 → 20 Aug 2026
MENIFEE POWER BANKCAISORIVERSIDE, CA680 MWstatus ACTIVE → COMPLETED17 Aug 2026 → 18 Aug 2026
What each operator actually fills in, counted in its newest copy. A blank column is the operator's gap, not ours, and it is why a move on some pages can never be a status change counted in each operator's newest copy
OperatorProjects in its newest copyWith a project nameWith a statusWith an in-service date
CAISO2,2782,2782,278none
SPP1,0272011,027926
ISO-NE1,7471,747none1,735
NYISO1,6381,6381,638178
MISO3,8033,7013,8033,771
ERCOT1,8391,8391,8391,839

Who published the data on this page

  • Every row on this page was published by a grid operator, not by us. Written out in full, they are the California ISO, ISO New England, New York ISO, Southwest Power Pool, Midcontinent Independent System Operator and Electric Reliability Council of Texas. We keep dated copies of their public queue files; the projects, the names and the wording inside those rows are theirs.
  • The Southwest Power Pool allows their material to be copied and passed on only with a proper credit, and only outside a commercial publication. So, plainly: this page uses material published by the Southwest Power Pool, and this page is not for sale.
  • This file uses material published by the California ISO.
  • Copyright © 2026 California Independent System Operator. All rights reserved.
  • Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most".

What this page cannot tell you

  • Seven state pages are not part of the subscription, and the 99 moves we hold for them are not in the weekly file. Over 79 days of collection, Kansas, Nebraska and Oklahoma produced no project that moved under a name, Connecticut, Maine and Massachusetts produced one each, and New Hampshire produced two. Those pages stay where they are and stay free to read — we are just not selling them. The ERCOT page is not part of it either: nothing in that queue has moved between any two copies we hold, so there is nothing of it to leave out.
  • This feed covers the operators in the first table and nothing else. Some large grid operators are not here at all, and where a source told us not to collect it we stopped. If the one you follow is missing, email operations@ustechautomations.com and we will tell you straight whether we can collect it.
  • We only report what two of our own dated copies say. We do not chase the operator, read filings, or ring anybody up to find out why a project moved.
  • This is our last copy of the MISO file. We sealed it on 6 Aug 2026 and we have not asked for it since, so every row and every date here stays exactly where it is. We are not promising you another one. Nothing is trying to fetch it, so nothing here is going to move on its own. If we start reading it again the date at the top changes and you will see it.
  • This is our last copy of the ERCOT file. We sealed it on 30 Jul 2026 and we have not asked for it since, so every row and every date here stays exactly where it is. We are not promising you another one. Nothing is trying to fetch it, so nothing here is going to move on its own. If we start reading it again the date at the top changes and you will see it.
  • A move here means two dated copies of the same public file disagree. It is not a decision, an approval, or a filing. If you need to know why a project moved, the operator is the place to ask, not us. Email operations@ustechautomations.com and we will send you both dated copies so you can check ours.

See the file we hold

You do not have to take our word for what is in the file. Here are 17 rows of the real thing, carrying all 9 of its columns, cut out of the dated copies we sealed ourselves. Nothing in it is made up and nothing in it is tidied up.

  • Open the 17 rows as a CSVA plain spreadsheet file. It saves to your machine rather than painting itself into a browser tab, and it opens in Excel, Numbers or Google Sheets.
  • The same 17 rows as JSONThe same rows again, laid out for reading with code.

Nothing on this page is for sale. The sample file is free to read, and so is every row on the page above it.

These 17 rows are a slice of the file, not the whole of it. What we cannot show you here is how far back it goes: the file goes back further than these rows do.

This page is not for sale

Nothing is sold from this page. Email operations@ustechautomations.com. The rows above include material whose publisher permits copying only outside a commercial publication, so nothing is sold from this page. We reply with what we hold for this one, and with what we do not hold.