US Tech Automations

Construction records Metro File 233 changed permits

Austin, Texas: the Metro File, $349 once

The Austin, Texas portal already publishes its permit table free. For $349, once, you get the status-change record: 233 permits that changed status across 74 sealed days, with 6 named holes. You are not buying the full board and you are not buying a ranking.

Price
$349
Built for
Expediters, lenders and data teams who need every status change on a named metro's permits, not the full board dump and not a ranking
Read
One-time snapshot
Newest sealed read
2026-08-25

Buy the file — $349 once$349 once, for the metro named on the page. Nothing recurring, nothing to cancel and no subscription behind it. You are buying this status-change file once. Say which metro in the note at checkout, or reply to your receipt naming it.

Newest sealed read: 2026-08-25. Austin, Texas window 2026-06-07 to 2026-08-25. 74 sealed dates, 6 named holes. This is a one-time snapshot, not a feed we re-read for you after you pay.

233 Austin permits changed status while we were watching233 changed permits · newest sealed read 2026-08-25

Austin, Texas is the metro where Active mostly became Final. Of 249 transitions, 197 are Active to Final. 26 Active permits went Inactive Pending Revision; 14 of those came back to Active. Three were Withdrawn. Three were Cancelled because a contractor was required. Two went On Hold. That mix is the Austin file. It is not 2,372,018 board rows.

  • 233 permits with more than one distinct status inside Austin, Texas.
  • 249 status transitions (one row per old-to-new move).
  • 2,370 distinct permits in the extract for this metro, out of 110,282 snapshot rows.
  • Sealed dates from 2026-06-07 to 2026-08-25: 74 present, 6 holes.
  • This is not the full board CSV at Austin, Texas city permit board file. That product is the published table. This product is the change record.
  • This is not Metro issued-permit changes, which is Not for sale.

Active to Final is the Austin story, not the whole board

Counted off the extract, not guessed. A permit can move more than once, which is why 233 changed permits produced 249 transitions.

Status pairs counted off the extract for Austin, Texas as of 2026-08-25
Old statusNew statusTransitions
ActiveFinal197
ActiveInactive Pending Revision26
Inactive Pending RevisionActive14
ActiveWithdrawn3
ActiveCancelled - Contractor Required3
ActiveOn Hold2
On HoldActive2
Cancelled - Contractor RequiredActive1
ActiveVOID1

Ten real change rows from Austin, Texas

These rows are in the file you buy. They are not a dump of the city's full board and they are not a ranking. Person-name columns are not in this extract.

10 of 249 transitions for Austin, Texas sealed 2026-06-07 to 2026-08-25
PermitOld statusNew statusOld first sealedNew first sealedClassZip
austin:2026-091173BPActiveWithdrawn2026-07-182026-08-15low_intent78722
austin:2026-094118BPActiveCancelled - Contractor Required2026-07-242026-08-16low_intent78759
austin:2026-069451BPActiveOn Hold2026-06-102026-08-17high_intent78746
austin:2026-069451BPOn HoldActive2026-08-172026-08-19high_intent78746
austin:2026-046792BPInactive Pending RevisionActive2026-08-202026-08-22high_intent78757
austin:2026-105907BPActiveFinal2026-08-152026-08-22low_intent78749
austin:2026-046791BPActiveInactive Pending Revision2026-08-222026-08-23high_intent78757
austin:2026-046792BPActiveInactive Pending Revision2026-08-222026-08-23high_intent78757
austin:2026-100328BPActiveFinal2026-08-062026-08-23low_intent78729
austin:2026-103662BPActiveFinal2026-08-122026-08-23low_intent78739

Coverage holes we will not paper over

A hole is a calendar day between 2026-06-07 and 2026-08-25 with no sealed copy in the extract. It is not a claim the city published nothing that day.

  • 2026-06-19 — no sealed copy on this calendar day.
  • 2026-06-20 — no sealed copy on this calendar day.
  • 2026-06-21 — no sealed copy on this calendar day.
  • 2026-07-04 — no sealed copy on this calendar day.
  • 2026-07-15 — no sealed copy on this calendar day.
  • 2026-08-08 — no sealed copy on this calendar day.

Who published the data on this page

  • Every permit in this file was published by Austin, Texas, not by us. Source: City of Austin Open Data Portal.
  • We sealed dated snapshots ourselves. The change record is counted off those snapshots (table permit_prediction_snapshots, extract of 2026-08-25, 533,569 rows across six cleared boards).
  • Austin puts this data in the public domain. This page uses material published by the City of Austin, Texas.

What this page cannot tell you

  • Austin's board file (City permit board files / Austin) is the published table back to 1921. This Metro File starts at the first sealed snapshot on 2026-06-07 and ends 2026-08-25.
  • VOID appears in Austin snapshots (180 rows) but produced no status transition in this extract — a permit that stayed VOID the whole window is not a change.
  • The city portal stays free. You are paying for one assembled change-record CSV, not for a new source.
  • This is a snapshot. You buy the file once. We do not send a new copy next month unless you buy again.
  • permit_class in this extract is our intent label (low_intent / high_intent), not the city's own type word.

See the file before you pay

You do not have to take our word for what is in the file. Here are real change rows, carrying the same columns as the paid CSV, cut out of the dated copies we sealed ourselves. Nothing in it is made up and nothing in it is tidied up.

  • Open the sample as a CSVA plain spreadsheet file. It saves to your machine rather than painting itself into a browser tab, and it opens in Excel, Numbers or Google Sheets.
  • The same rows as JSONThe same rows again, laid out for reading with code.

What arrives after you pay: a person emails you the CSV within one working day of your payment — the same plain spreadsheet as the sample file above, not a login and not a web page.

What you would be paying for: $349 once, for the metro named on the page. Nothing recurring, nothing to cancel and no subscription behind it. You are buying this file once. After you pay, a person emails you the CSV within one working day.

Ask before you buy

$349 · One-time file, not a subscription

There is no card button on this page yet. Email operations@ustechautomations.com. Name the metro. We reply with the change count, the hole list, and the checkout link, before you pay anything.

$349 once, for the metro named on this page. Nothing recurring, nothing to cancel and no subscription behind it. After you pay, a person emails you the CSV within one working day.

Email us before you pay

More from this feed