Interconnection queue › New York › Nassau County
Nassau County, New York Interconnection Queue
Snapshot of 2026-09-07 · 47 projects · New York (NY)
There are 47 projects in the interconnection queue located in Nassau County, New York (NY), totaling 25,924 MW across the 46 that publish a capacity.
Technology in Nassau County
See what moved in Nassau County, New York each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in Nassau County, New York, from new entries to projects that came off the list.
Email me Nassau County, New York queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| NYISO | 47 | 25,924 MW |
By fuel, as published
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here. The national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| ES | 20 | 2,736 MW |
| W | 20 | 20,818 MW |
| CT | 3 | 618 MW |
| ST | 1 | 37 MW |
| AC | 1 | not published |
| DC | 1 | 275 MW |
| CW | 1 | 1,440 MW |
By status, as published
| Status | Projects | Capacity |
|---|---|---|
| Withdrawn | 47 | 25,924 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| OW Ocean Winds East 3 | NYISO | 1,600 | Withdrawn | 2021-05-27 | not published |
| EI Empire ESS II | NYISO | 1,440 | Withdrawn | 2021-05-21 | not published |
| Vineyard Wind I | NYISO | 1,403 | Withdrawn | 2020-04-30 | not published |
| Bluepoint Wind 4 | NYISO | 1,382 | Withdrawn | 2023-09-26 | not published |
| Vineyard Mid-Atlantic 2 | NYISO | 1,330 | Withdrawn | 2022-09-28 | not published |
| Vineyard Mid-Atlantic 3 | NYISO | 1,330 | Withdrawn | 2022-11-30 | not published |
| NY Wind - New Bridge Road | NYISO | 1,325 | Withdrawn | 2020-07-27 | not published |
| Community OSW Barrett 3 | NYISO | 1,310 | Withdrawn | 2023-12-21 | not published |
| EI Glenwood Landing | NYISO | 1,300 | Withdrawn | 2020-05-27 | not published |
| NY Wind - Shore Road | NYISO | 1,272 | Withdrawn | 2020-07-27 | not published |
| EI Oceanside 2 | NYISO | 1,260 | Withdrawn | 2019-12-11 | not published |
| OW Ocean Winds East 1 | NYISO | 1,200 | Withdrawn | 2021-05-18 | not published |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| NYISO | 2026-09-07 | 2026-08-13 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.