Interconnection queue › Pennsylvania

Pennsylvania Interconnection Queue

Snapshot of 2026-07-30 · 28 projects · NYISO

There are 28 projects in the interconnection queue with a Pennsylvania location, totalling 7,664 MW across the 27 that publish a capacity.

Get told what moves in Pennsylvania

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Pennsylvania: what entered, what moved study phase, what came off the list.

Email me Pennsylvania queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
NYISO287,664 MW (from 27 of 28 projects)

By fuel, as published

Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.

FuelProjectsCapacity
S71,819 MW
W71,210 MW
ES61,790 MW
CR41,300 MW
CC31,545 MW
AC1not published

Top counties

CountyProjectsCapacity
Clearfield72,099 MW
McKean51,470 MW
Tioga3770 MW
Clinton3995 MW (from 2 of 3 projects)
Mckean County31,000 MW
Tioga - Bradford2270 MW
Bradford2250 MW
Elk1290 MW
Clinton County1120 MW
Jefferson1400 MW

Where each number came from

Read this before quoting a figure. We re-read every source every week, but a weekly read of an unchanged file is not weekly data. These have not moved in a while: NYISO last changed 2026-07-16 (3 identical reads since). Those rows are exactly as current as the ISO's own published file, and no more.
ISOWe last readSource last changedSource
NYISO2026-07-302026-07-16 (unchanged across 3 weekly reads)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.