Interconnection queueTexas › Solar

Solar Projects in the Texas Interconnection Queue

Snapshot of 2026-07-30 · 690 projects

690 solar projects are in the interconnection queue with a Texas location, totalling 157,020 MW across the 690 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in Texas

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Texas: what entered, what moved study phase, what came off the list.

Email me solar in Texas queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ERCOT632151,965 MW
MISO492,779 MW
SPP92,276 MW

By status, as published

StatusProjects
SS Completed, FIS Started, No IA332
SS Completed, FIS Started, IA130
SS Completed, FIS Completed, IA120
Withdrawn34
SS Completed, FIS Completed, No IA32
SS Started, FIS Started, No IA14
Done9
DISIS STAGE7
Active6
SS Completed, FIS Not Started, IA2
Small Gen2
ERAS1

Top counties

CountyProjectsCapacity
Wharton204,484 MW
Navarro183,212 MW
Pecos187,421 MW
Milam174,063 MW
Lamar153,324 MW
Brazoria143,013 MW
Matagorda122,916 MW
Haskell112,479 MW
Ector112,373 MW
Hill111,689 MW
Wilbarger102,824 MW
Zapata102,283 MW
San Patricio92,182 MW
Borden93,352 MW
Falls81,522 MW

Where each number came from

Read this before quoting a figure. We re-read every source every week, but a weekly read of an unchanged file is not weekly data. These have not moved in a while: ERCOT last changed 2026-06-11 (9 identical reads since). Those rows are exactly as current as the ISO's own published file, and no more.
ISOWe last readSource last changedSource
ERCOT2026-07-302026-06-11 (unchanged across 9 weekly reads)source file
MISO2026-07-302026-07-30 (changed this snapshot)source file
SPP2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.