Interconnection queue › Vermont
Vermont Interconnection Queue
Snapshot of 2026-09-07 · 109 projects · ISO-NE
There are 109 projects in the interconnection queue with a Vermont location, totaling 7,842 MW across the 84 that publish a capacity.
Technology in Vermont
See what moved in Vermont each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in Vermont, from new entries to projects that came off the list.
Email me Vermont queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 109 | 7,842 MW |
By fuel, as published
Shown in each ISO's own coding. A state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.
| Fuel | Projects | Capacity |
|---|---|---|
| SUN | 31 | 725 MW |
| WND | 23 | 576 MW |
| N/A | 19 | 5,650 MW |
| BAT | 8 | 575 MW |
| WDS | 6 | 126 MW |
| WAT | 6 | 9 MW |
| (not published) | 5 | not published |
| DFO | 4 | 19 MW |
| DFO NG | 4 | 119 MW |
| NUC | 1 | not published |
| LFG | 1 | 5 MW |
| DFO WDS | 1 | 37 MW |
Counties in Vermont
16 counties appear in these rows. 0 have enough projects to answer a county-level question and are linked below; the rest are listed with their counts and get no page of their own, and 1 carry a placeholder instead of a location, so we cannot say where those projects are.
| County | Projects | Capacity | |
|---|---|---|---|
| Windsor County | 20 | 2,596 MW | |
| Franklin County | 17 | 880 MW | |
| Rutland County | 13 | 1,280 MW | |
| Orleans County | 9 | 142 MW | |
| Windham County | 9 | 208 MW | |
| Addison County | 8 | 1,895 MW | |
| Bennington County | 7 | 113 MW | |
| Chittenden County | 7 | 117 MW | |
| Caledonia County | 5 | 40 MW | |
| Colchester County | 4 | 400 MW | |
| Essex County | 3 | 27 MW | |
| Orange County | 3 | 60 MW | |
| Calendonia and Essex County | 1 | 60 MW | |
| N/A | 1 | not published | |
| Washington County | 1 | 5 MW | |
| West Rutland County | 1 | 20 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | County | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|---|
| NE Clean Power Link - controllable HVDC Tie - Import only | ISO-NE | Windsor | 1,000 | not published | 2/16/2015 | 12/31/2027 |
| HVDC Tie - Import only | ISO-NE | Rutland | 1,000 | not published | 2/16/2015 | 12/31/2018 |
| HVDC Tie - Import only | ISO-NE | Addison | 1,000 | not published | 2/16/2015 | 12/31/2018 |
| HVDC Tie - Import only | ISO-NE | Windsor | 1,000 | not published | 2/16/2015 | 12/31/2017 |
| HVDC Tie - Import only | ISO-NE | Franklin | 425 | not published | 2/16/2015 | 6/30/2018 |
| HVDC Tie - Import only | ISO-NE | Addison | 425 | not published | 2/16/2015 | 6/30/2018 |
| 150 kV HVDC Tie - Import Only | ISO-NE | Colchester | 400 | not published | 2/16/2015 | 12/31/2020 |
| controllable 150 kV HVDC Tie - Import Only | ISO-NE | Addison | 400 | not published | 9/18/2018 | 12/31/2023 |
| Solar | ISO-NE | Franklin | 196 | not published | 9/11/2015 | 7/1/2017 |
| Battery Storage | ISO-NE | Windsor | 180 | not published | 4/3/2023 | 4/8/2027 |
| Battery Storage | ISO-NE | Windsor | 115 | not published | 4/9/2024 | 8/30/2028 |
| Battery Storage | ISO-NE | Windsor | 105 | not published | 4/3/2023 | 4/8/2027 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.