Interconnection queue › ISO-NE

ISO-NE (New England) Interconnection Queue

Snapshot of 2026-07-30 · 1,747 projects

The ISO-NE queue currently lists 1,747 projects, totalling 193,097 MW across the 1,471 of them that publish a capacity.

By fuel, as published

Reproduced using ISO-NE's own codes. The national table maps these onto shared buckets; this one does not.

FuelProjectsCapacity
SUN38010,077 MW
BAT27439,968 MW
WND24446,467 MW (from 236 of 244 projects)
N/A14457,175 MW (from 88 of 144 projects)
SUN BAT1392,442 MW
NG13314,288 MW (from 99 of 133 projects)
(not published)11911 MW (from 3 of 119 projects)
DFO NG10516,096 MW (from 83 of 105 projects)
WAT661,371 MW (from 62 of 66 projects)
WDS40730 MW (from 29 of 40 projects)
DFO14567 MW (from 7 of 14 projects)
LFG1249 MW (from 7 of 12 projects)
NUC11149 MW (from 6 of 11 projects)
BIT1158 MW (from 7 of 11 projects)
WND BAT101,081 MW
FC631 MW
WAT BAT538 MW
KER NG4341 MW
DFO KER NG4273 MW
NG WO3389 MW
KER2322 MW (from 1 of 2 projects)
JF KER NG2322 MW
MSW24 MW
NG SUN BAT28 MW
BLQ WDS232 MW
JF KER1not published
KER BAT11 MW
SUN WAT14 MW
JF118 MW
JF NG1not published
DFO KER178 MW
NG WDS110 MW
BIT RFO18 MW
DFO SUB15 MW
DFO WDS137 MW
NG OTH1570 MW
BLQ DFO KER WDS175 MW
NG RFO1not published

Status

ISO-NE does not publish a status column in this report, so we show none. Every other ISO page here has one; this gap is the ISO's, not a hole in our collection.

Get told what moves in ISO-NE

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in ISO-NE: what entered, what moved study phase, what came off the list.

Email me ISO-NE queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

Top states

StateProjectsCapacity
Massachusetts60581,350 MW (from 528 of 605 projects)
Maine40736,969 MW (from 362 of 407 projects)
Connecticut32138,947 MW (from 245 of 321 projects)
New Hampshire13811,124 MW (from 118 of 138 projects)
Rhode Island12311,820 MW (from 117 of 123 projects)
Vermont1097,842 MW (from 84 of 109 projects)
(not published)3053 MW (from 4 of 30 projects)
New York134,992 MW (from 12 of 13 projects)
NB10 MW

Top counties

CountyProjectsCapacity
Worcester1046,210 MW (from 100 of 104 projects)
Franklin945,639 MW (from 86 of 94 projects)
Middlesex7912,332 MW (from 63 of 79 projects)
Hampden686,307 MW (from 62 of 68 projects)
Bristol657,799 MW (from 56 of 65 projects)
New Haven654,897 MW (from 45 of 65 projects)
Fairfield647,065 MW (from 42 of 64 projects)
Hartford573,025 MW (from 53 of 57 projects)
N/A531,357 MW (from 15 of 53 projects)
NA5131,120 MW (from 48 of 51 projects)
Penobscot501,152 MW (from 41 of 50 projects)
Plymouth507,056 MW (from 43 of 50 projects)
Providence493,839 MW (from 44 of 49 projects)
Washington472,538 MW (from 46 of 47 projects)
New London438,457 MW (from 34 of 43 projects)

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.