Best Early Payment Solution for Subcontractors: 5 Picks 2027
Key Takeaways
The category decision comes first: when a general contractor runs the program, the GC chooses the funder; when you are a subcontractor with no program in place, only a sub-side advance fits.
Published terms are thin. Billd and ProNovos publish fee or discount figures, while Procore, C2FO and the GC side of Earlytrade are quote-based on the pages checked.
Compare cost over the real wait, not the headline rate, because a fee that looks small can outrun a discount when the wait is long.
Federal construction primes face a short statutory payment window to subcontractors, but most private jobs run on subcontract terms instead.
Procore's Early Pay Programs are labeled beta on its support pages, so confirm access before you plan cash flow around them.
US Tech Automations sits above these vendors as the approval-to-payment layer; it does not replace the funder.
The short answer and what early payment means
The best early payment solution for construction subcontractors depends on who controls the program, so start by asking whether your general contractor will enroll you. An early payment solution pays a subcontractor's approved invoice or pay application before the general contractor's normal due date, usually in exchange for a discount or fee. When a GC runs a program, the choice is between GC-funded terms, third-party-funded terms and terms the subcontractor sets for each invoice. When no program exists, a subcontractor can use a sub-side advance, which gets more expensive the longer the wait runs.
TL;DR: A subcontractor without a GC program should price a sub-side advance first, while a GC with tight cash should start with a third-party-funded program and get every fee in writing before enrolling anyone.
Why subcontractors wait
Payment delay is the reason this category exists. Construction Dive reported on a 2025 survey by Billd, a subcontractor-finance vendor, in which Average subcontractor wait after a pay application: 56 days according to Construction Dive (2025). The same report says general contractors believed payment went out about 30 days after a pay application, and the survey covered more than 800 subcontractors, general contractors and suppliers. Treat that gap as vendor-run data that trade press reported, not an independent census.
A 2026 survey published by Siteline, a billing software vendor, points the same way on final payment. Subcontractors waiting over 90 days for final payment: 43% according to Contractor (2026), compared with 15% of general contractors in the same survey, which drew 492 construction finance and operations professionals in May 2026.
What the payment rules require
Federal rules set a short clock for federal construction work. Federal prime payment window to subcontractors: 7 days according to Acquisition.gov (2017 clause text). The clause requires the prime contractor to pay each subcontractor no later than 7 days after receiving payment from the government, and it requires subcontracts to carry matching payment terms down the tiers. Private jobs follow the subcontract, the GC's payment terms and state law instead, so a federal clock does not tell you when a private GC will pay. Read your own contract before you pick a product.
How we evaluated these tools
This is an informed buyer's guide built from public pages, not from hands-on use of the products. We opened each vendor's site and pricing page where one existed, then used government text and trade press for the rules and survey context. The weights below are our judgment about what matters to a small construction business, not vendor data. Factual vendor data appear in the feature matrix, pricing table and profiles, and our analysis is the weighting and the recommendations.
| Criterion | Weight | Why it matters to this buyer |
|---|---|---|
| Published, verifiable terms | 20% | A fee stated in days and percentages can be checked against your own wait, while a quote-only product cannot. |
| GC balance-sheet exposure | 20% | Programs that draw on the GC's own cash shift timing risk onto the GC. |
| Who can start it | 15% | A subcontractor who can start alone does not need a GC to act this month. |
| Fit with accounting and pay-app records | 15% | Manual re-keying is where small teams lose time and make errors. |
| Availability | 15% | Beta or quote-only access limits when you can plan around a product. |
| Setup effort for a small firm | 15% | Long implementations rarely fit a small owner's calendar. |
Feature matrix: who starts it and who funds it
The matrix is a starting filter, not a ranking. A "Not stated" cell means the page checked did not say, so the answer belongs in the vendor's written terms.
| Vendor | Subcontractor starts it alone | Who funds the early money | Published terms | Status on pages checked |
|---|---|---|---|---|
| Billd | Yes, the advance is described from the subcontractor side | Billd's advance product | Fees published on an undated comparison page | Undated product and comparison pages |
| ProNovos QuickPay | No, the GC enrolls subs | Viva Capital, per the QuickPay page | Discount menu published | Announced April 2025 |
| Procore Pay Early Pay Programs | No, the GC sets rates and invites subs | Not stated | Not published | Beta label on support pages |
| Earlytrade | Yes, subs request early pay per invoice | Not stated on the page checked | Sub sets the discount; GC terms not published | Pricing address returned a 404 when checked |
| C2FO Dynamic Supplier Finance | Supplier proposes a discount after the buyer enrolls | Buyer chooses the funding source | Quote-based | Vendor page, no price list |
Published pricing and what it leaves out
The pricing table lists only what each vendor's own pages publish, and it marks the rest as quote-based. Where a vendor publishes no price, the cell says so rather than estimating.
| Vendor | Plan or program | Published price terms | Price status |
|---|---|---|---|
| Billd | Pay App Advance | Purchase fee plus weekly fee; figures in the worked example below | Published on undated pages |
| ProNovos | Nova annual plan, year one | $7,300 according to ProNovos (undated) | Published for the Nova platform |
| ProNovos | QuickPay | Subcontractor chooses a discount tier from a published menu | Partly published; GC cost stated as none |
| Procore | Procore Pay Early Pay Programs | Not published | Quote-based |
| Earlytrade | Subcontractor portal | Free to use, per Earlytrade's page | Subcontractor side free; GC side quote-based |
| C2FO | Dynamic Supplier Finance | Not published | Quote-based |
Pricing checked November 17, 2026.
Billd's pricing page lists lien-service document fees and says the "no subscription cost" model applies, but it does not publish early-pay terms, so check Billd's pricing page only for lien work. Procore's general pricing is quote-based; its pricing page says "We charge an upfront annual fee by product and based upon your Annual Construction Volume (ACV)," and it does not list Procore Pay Early Pay rates. Earlytrade's /pricing address returned a 404 error when checked, so ask for its GC-side terms directly.
Take a hypothetical subcontractor with a $120,000 pay application that the general contractor would normally pay after 56 days, the average wait cited earlier. An illustrative discount tier of 2.25% costs $2,700 ($120,000 × 2.25%), but it exists only if a GC enrolls the subcontractor and the subcontractor accepts that tier. A sub-side advance priced the way Billd's comparison page describes, a 2% purchase fee plus $50 per week per $10,000, costs $2,400 up front and $600 per week, or $4,800 over 8 weeks, for a total of $7,200, which is 6% of the advance, according to Billd (undated page, 2022 footer). If the workflow sends that offer by SMS through Twilio, a non-null error_code appears on the message resource when a message fails or is undelivered, so a person should review every record where that field is populated before the offer counts as delivered (Twilio message resource docs).
The table below repeats the worked example's figures for comparison; the sources are cited in the paragraph above.
| Option | How the cost is built | Cost on $120,000 | Share of the advance |
|---|---|---|---|
| Discount tier at 2.25% (illustrative) | $120,000 × 2.25% | $2,700 | 2.25% |
| Advance over 8 weeks (illustrative) | $2,400 fee + ($600 per week × 8 weeks) | $7,200 | 6.00% |
| No advance, wait 56 days | No fee; cash gap | $0 in fees | 0.00% |
Vendor profiles
Billd
Billd's Pay App Advance page is written from the subcontractor's side. It "Advances up to 100% of the total pay app less a purchase fee," and repayment is due "Pay us when you're paid or at 60 days, whichever comes first," according to Billd (undated page). The comparison page sets the cost figures used in the worked example above.
Best fit: a subcontractor that needs a bridge before a GC pays and cannot wait for a GC program.
Limitations: the page does not publish a rate sheet, the comparison page is undated with a 2022 footer, and Billd says pricing and features may vary in California and New York. The repayment trigger is the earlier of payment or 60 days, so a GC who pays late still leaves you owing at day 60.
Implementation: ask for a current written rate sheet, confirm how the advance is documented with your GC, and model the 60-day trigger against your GC's actual payment dates.
ProNovos QuickPay
QuickPay is a GC-side program. The GC enrolls subcontractors, subcontractors opt in, and Viva Capital funds the advances. The QuickPay page says "Viva Capital funds them, not you" and "It costs you nothing" for the GC, and it describes "No capital outlay, no risk to your balance sheet." Subcontractor discount tiers: 1.75% to 3.00% according to ProNovos (undated), with five tiers in the calculator. The GC's share of each discount depends on repayment timing, and the page says "The faster the repayment, the bigger your share of the discount."
ProNovos and Viva Capital announced QuickPay in April 2025, and the release says QuickPay "does not require general contractors (GCs) to front the cash."
Best fit: GCs that want to offer early pay without drawing on their own cash.
Limitations: the pages checked do not say whether QuickPay requires a Nova subscription, and a separate ProNovos page names a "QuickPay Direct" product that this guide did not evaluate. Confirm which product you are buying.
Implementation: the release says the process "happens inside the ProNovos platform in just a few clicks," but enrollment still needs your sub list and invoice data in a usable format.
Procore Pay Early Pay Programs
Procore's March 31, 2026 release says Procore Pay "now empowers General Contractors to launch and manage Early Pay Programs (EPPs)," with the feature "Launching April 21st," according to Procore (2026). The support center labels the feature as a beta, stating "This content is for participants of Procore Pay Early Pay Beta Program," according to Procore (beta label, undated). Payors "Offer two (2) fees to payees: Standard or Preferred" and set the rates, but the page publishes no percentage.
Best fit: GCs already running Procore Pay that have beta access.
Limitations: no rate is published, the page does not plainly say who pays the fee, opting out stops the fee on that payee's unpaid invoices, and deactivating a program removes all participants.
Implementation: confirm beta status with Procore first, then set Standard and Preferred rates for each payee group. Procore's general pricing does not cover Early Pay rates, so get those in writing.
Earlytrade
Earlytrade's subcontractor page says subcontractors get early access to payment on approved invoices and that "It is free to use the Earlytrade subcontractor portal." It also says there is "no mandate or cost to use Earlytrade, only the discount you choose to accept in exchange for early payment," according to Earlytrade. The page says "Discount rates for early payments are set by you."
Best fit: subcontractors that want to choose a discount invoice by invoice, and GCs that want participation led by the subcontractors.
Limitations: the page publishes no GC pricing, its /pricing address returned a 404 when checked, and it does not state the funding model. Ask whether the GC or a third party funds the early money.
Implementation: get the GC-side terms in writing, confirm which accounting systems export invoice status, and confirm how the discount is recorded on each payment.
C2FO Dynamic Supplier Finance
C2FO is built for buyers that manage supplier programs, and it is not construction-specific. Its page says its Name Your Rate feature "lets suppliers propose their own discount," and it lists funding from the buyer's balance sheet, bank partners, C2FO's network, or a mix, as described on C2FO's dynamic supplier finance page. The page says the platform "integrates with your existing AP systems in weeks, not months."
Best fit: GCs with a large supplier base and an AP team that can set pricing by supplier segment.
Limitations: quote-based, not built for subcontractors, and the page does not list commercial terms.
Implementation: choose the funding source, set rates by supplier segment, and ask for an AP integration plan before committing.
Who this is for
A subcontractor with no GC program: get the advance terms in writing, then compare the advance cost to your actual wait.
A GC that wants to offer early pay without using its own cash: shortlist QuickPay and confirm the GC-side terms in writing.
A GC already on Procore Pay: ask about Early Pay beta access before you buy anything else.
A GC that wants subcontractors to pick their own discounts: Earlytrade fits that model, but confirm its funding structure.
A large AP team with many suppliers: C2FO is worth a quote, though it is not built for construction.
Red flags: your GC will not enroll you in any program, the advance cost would exceed the margin you keep on that job, or your accounting export cannot show approved pay applications with due dates.
Implementation: approvals, notices and exceptions
A proposed workflow for a GC running an enrollment program would be configured this way. The trigger is an approver marking a subcontractor's pay application as approved in the accounting system. The workflow then checks that subcontractor against the eligible list, compares the amount and due date with the program's terms, and creates an offer record. The output is a review queue showing the amount, the due date and the proposed discount tier. Prerequisites are a scheduled export or API access to approved invoices and due dates, a vendor-confirmed enrollment path, and a named approver. Human review points are the offer approval, any change to a discount tier, and any payment whose amount differs from the approved pay application.
A proposed workflow for a subcontractor would start when a pay application is submitted, compare the expected GC payment date with the advance's cost in dollars and weeks, and create a decision card for the owner. The owner's approval, not the workflow, decides whether to accept. Notices go out by SMS through Twilio, which requires a Twilio account and documented consent from recipients, and the workflow routes any record with a non-null error_code to a person rather than assuming the notice arrived.
The DIY route is stitching this together in Zapier, Make or n8n. Those tools can support run histories, retries, error branches and audit evidence when configured. The buyer still designs and owns idempotency, so one invoice never creates two offers, along with escalation, access controls and ongoing maintenance. A US Tech Automations design could configure those pieces differently: duplicate checks keyed on the invoice identifier, a named reviewer for each offer, and an exception queue that lists every blocked item. Its prerequisites match a DIY build: admin access to the accounting system, a stable export, and a written list of who may accept discounts.
When NOT to use US Tech Automations: a simpler option wins if you send only a few early-payment requests a month and your bank's bill-pay or accounting system already handles them; if every subcontractor on your jobs is already inside a Procore Pay early-pay program, where Procore's own workflow covers approvals; or if what you need is money rather than process, since orchestration does not supply funding.
Common mistakes
Comparing headline rates without modeling the wait length for each invoice.
Accepting a discount or advance without a written repayment trigger.
Enrolling subcontractors before confirming who funds the program.
Assuming beta access is available to your account.
Treating an undated comparison page as current terms; get a fresh quote before you commit. For the broader AP side, see our guide to AP automation for construction accounting.
Frequently asked questions
Which early payment option costs a subcontractor the least?
On the published terms reviewed here, a GC-run discount tier usually costs less than a sub-side advance over the same wait, but only if the GC enrolls you.
Does a general contractor have to fund early payments?
Not always: the QuickPay page says Viva Capital funds the advances, so the GC has no capital outlay. The Procore and Earlytrade pages do not say who funds the early money, so ask.
Does the federal 7-day rule cover my private job?
No, not directly. The 7-day requirement comes from FAR 52.232-27 on federal construction contracts, so a private job follows its subcontract and state law.
Is Procore's early pay available to every Procore user?
No. Procore's support pages label Early Pay as a beta program, so access depends on enrollment in that beta.
Does US Tech Automations replace these vendors?
No. The proposed workflows orchestrate approvals, offers, notices and exceptions above the funder, and the funder still sets the money terms.
Should I choose a vendor first or automate first?
Choose the funder first, because the workflow depends on that vendor's enrollment path and export options. Then decide whether a stitched build in Zapier, Make or n8n is worth owning and maintaining.
Bottom line
The best early payment solution for construction subcontractors is the one your GC will enroll you in, funded on terms you can read in writing. If no program exists, the sub-side advance is the only option here that starts without a GC. Model the cost over your actual wait, confirm beta and quote-only terms before committing, and check the 60-day repayment trigger on any advance. To see how an approval queue and notice workflow could be configured for your team, see how US Tech Automations configures this.
About the Author

Helping businesses leverage automation for operational efficiency.