Research & Data

6,136 Residential Permits Across 8 US Metros, One Window

Aug 25, 2026

Every city publishes its own residential building permits on its own timetable, in its own format, with its own definitions. US Tech Automations collects eight of those feeds daily and puts them side by side, on the same 30-day window, using one residential definition applied consistently — the same daily feeds behind our permits-by-city index. This edition covers July 24, 2026 – August 22, 2026.

Los Angeles issued more residential permits than any other city in this edition — 2,983 — but that single number does not mean Los Angeles is building the most homes. Keep reading before you compare it to anything.

Key Takeaways

  • 6,136 residential permits were collected across 8 metros in the 30-day window, worth $891.6M in project value where cities publish a cost.

  • Los Angeles led on raw count at 2,983 permits; Cincinnati and Scottsdale trailed at 130 and 62.

  • Austin publishes no usable project cost on its residential permits — no valuation figure exists for it, and this report never prints a $0 in its place.

  • Chicago and New York's residential counts are a conservative floor, not a full count — both cities lack a structured residential flag, so the test reads permit descriptions and is deliberately cautious.

  • Four jurisdictions in our database — baton-rouge, cambridge-ma, marin-county, montgomery-md — are excluded from this edition because no credit line exists for them on file.

By Metro: Permits, Value, and Recency

MetroPermitsProject value (where published)Median project valueLatest permit date on file
Los Angeles, CA2,983$174.7M$7,500August 15, 2026
San Francisco, CA716$59.5M$20,000August 21, 2026
Austin, TX671not published by this citynot published by this cityAugust 22, 2026
Chicago, IL668$216.6M$44,488August 21, 2026
New York City, NY512$179.0M$200,000August 21, 2026
Seattle, WA394$97.8M$150,000August 22, 2026
Cincinnati, OH130$8.0M$15,000August 21, 2026
Scottsdale, AZ62$156.0M$371,630August 21, 2026

Across all 8 metros, 5,023 permits carried a usable project value out of 6,136 total. Los Angeles alone accounts for nearly half the permit count in this edition, but its median project value of $7,500 is the lowest of any metro — a reminder that permit count and dollar scale answer different questions.

What Each Metro Is Actually Permitting

Raw counts hide what kind of work is behind them. Each city's own permit-type label, not a category we invented, names the largest slice.

MetroTop permit type (city's own label)PermitsShare of that metro's total
Los Angeles, CABldg-Alter/Repair / 1 or 2 Family Dwelling1,89463.5%
San Francisco, CAotc alterations permit65591.5%
Chicago, ILPERMIT - RENOVATION/ALTERATION20230.2%
New York City, NYGeneral Construction / Initial Permit29156.8%
Seattle, WABuilding / Addition/Alteration20151%
Austin, TXR- 435 Renovations/Remodel / Repair21832.5%
Cincinnati, OHBuilding / Existing10681.5%
Scottsdale, AZSFR-CUSTOM IN SUBDIVISION1016.1%

San Francisco's single largest permit type covers 91.5% of everything the city issued in this window. Alteration and repair work dominates six of the eight metros; only Scottsdale's top category is new custom-home construction, and even there it accounts for barely a sixth of the city's permits — the other 26 distinct permit types Scottsdale reported split the rest.

Why Recency Varies by City, Not by Market

A low permit count is not always a slow market — it can just as easily be a slower-updating feed. Each city publishes on its own schedule, and this edition reports how many days behind the window's end each city's own latest permit date sits.

Seattle and Austin were current through the last day of the window (0 days behind). Los Angeles sat 7 days behind — its most recent permit on file dates to August 15, 2026, a week before the window closed on August 22. San Francisco, Chicago, New York, Cincinnati, and Scottsdale each sat 1 day behind. A city sitting several days behind its own feed can look artificially quiet in a raw count, which is exactly why this report prints the lag next to every number instead of letting a stale feed pass as a slow market.

That is also why this edition never compares one month's count for a metro against an earlier edition's count for the same metro without saying how many days behind each feed sat at the time. A city that reports fewer permits than the month before is not necessarily building less — it might simply have refreshed its open-data feed later relative to this edition's window than it did the last time this series ran. Reading a trend into a single number without checking the lag first is exactly the mistake this recency column exists to prevent.

Method in Plain English

Only residential building permits are collected — commercial and sub-trade permits are excluded at the point of collection, so nothing here counts all construction permits issued in a city, only the residential slice. Chicago and New York have no structured residential flag in their open-data feeds, so the residential test there reads the permit's own work description and is deliberately conservative; their counts are a floor on the residential slice, not city-wide volume.

Austin's feed publishes $0 or blank project costs on the residential permits it tracks, and we normalize those to missing rather than report a literal $0 — which is why Austin carries no valuation figure anywhere in this report. Our companion permit-and-labor benchmark walks through the same normalize-don't-invent rule applied to a different city comparison, if this pattern is useful context.

All figures are computed directly from sealed daily permit snapshots; nothing is estimated, modeled, or extrapolated. A city that publishes no usable project cost reports no valuation at all, never a zero. One project can carry more than one permit, so these are counts of permits, not of buildings, homes, or completed jobs.

Four jurisdictions in our underlying database are held out of this edition entirely, each for a stated reason rather than a silent drop.

Jurisdictions Excluded From This Edition

JurisdictionReason excluded
baton-rougeno credit line on file
cambridge-mano credit line on file
marin-countyno credit line on file, plus an unresolved share-alike question on packaged files — excluded from every research file
montgomery-mdno credit line on file

None of the four excluded jurisdictions is silently folded into any total above. The edition's permit and valuation totals cover only the 8 credited metros named in the first table.

A missing credit line is not a small formality. Every published number in this series carries an obligation to name exactly where it came from, character for character, and a jurisdiction without one does not get an exception — it gets left out until a credit line exists.

Put the Permit Data to Work

A residential contractor or a remodeling-focused general contractor sizing up which market to expand into cannot get this side-by-side view from any single city's own portal — each one only shows its own numbers, on its own schedule, in its own format. US Tech Automations builds the automation workflows that pull all eight feeds daily, apply one residential definition, and refresh the comparison the same way every month instead of reassembling it by hand. Our Search Console operating data applies the same side-by-side-sources discipline to a different first-party data set, if the pattern is useful beyond permits.

Frequently Asked Questions

Q: Which city issued the most residential permits?
A: Los Angeles, with 2,983 residential permits in the July 24 – August 22, 2026 window — more than four times the next-highest metro, San Francisco, at 716.

Q: Does the permit count mean Los Angeles is building the most housing?
A: Not by itself. Los Angeles's median project value was $7,500, the lowest of any metro in this edition, and its top permit type is alteration and repair work rather than new construction — a high permit count there mostly reflects small-scope work, not new homes.

Q: Why does Austin show no dollar values?
A: Austin's open-data feed publishes $0 or blank project costs on the residential permits it tracks. Rather than report a misleading $0, this report normalizes those to missing and states plainly that Austin publishes no usable project cost — no valuation figure is given for it anywhere.

Q: Are Chicago and New York's counts as reliable as the other cities'?
A: They are a conservative floor, not a full count. Both cities lack a structured residential flag in their permit data, so the residential test reads each permit's own description and is deliberately cautious about what it includes — real residential permits in both cities may be undercounted rather than overcounted.

Q: Why are only 8 metros included when the underlying database has more?
A: Four additional jurisdictions — baton-rouge, cambridge-ma, marin-county, and montgomery-md — have no credit line on file and are excluded from this edition for that reason. Marin County has an added, unresolved share-alike question that holds it out of every packaged research file.

Method and Provenance

Every permit count, valuation figure, and credit line in this report is read directly from our own sealed daily permit collection, snapshot sealed August 22, 2026. Residential building permits issued in the named cities over the stated window, collected daily from each city's own open-data service — commercial and sub-trade permits are excluded at collection time, so this is not a count of all construction permits issued in any city. All figures are computed directly from sealed daily permit snapshots; nothing is estimated, modeled, or extrapolated.

Credit, verbatim, for every metro in this edition: Los Angeles Department of Building and Safety via data.lacity.org (Socrata). San Francisco Department of Building Inspection via data.sfgov.org (Socrata). City of Chicago building permits via data.cityofchicago.org (Socrata). NYC Department of Buildings (DOB NOW) via data.cityofnewyork.us (Socrata). Seattle Department of Construction and Inspections via data.seattle.gov (Socrata). City of Austin issued construction permits via data.austintexas.gov (Socrata). City of Cincinnati building permits via data.cincinnati-oh.gov (Socrata). City of Scottsdale permits via the city's ArcGIS open-data service.

Source: US Tech Automations Research — Permits by Metro series, sealed 2026-08 edition, from each city's own open-data service.

Get this data as a daily feed for building permits

The numbers in this report come from a permit feed we monitor daily. Leave your email and we will follow up about a daily feed for your ZIPs and categories.

Prefer to talk first? Contact us.

Cite this report

US Tech Automations Research, 2026-08 edition. “6,136 Residential Permits Across 8 US Metros, One Window.” https://ustechautomations.com/resources/blog/which-us-metro-permitted-the-most-homes-last-month

Sealed snapshot sha256: 1ca589dd68e4c038

Machine-readable data: CSV · JSON · All research & methodology

Tags

US Tech Automations Researchbuilding permitsresidential constructionmetro comparison