Newest sealed read: 2026-08-29. We read this source every day. We hold 30 sealed runs going back to 2026-06-11.
What this page is62,280 rows held · newest sealed read 2026-08-29
- 2,076 power projects in California sit in the newest copy we hold of this waiting list: CAISO.
- We hold 30 dated copies covering California, the first from 11 Jun 2026 and the most recent read on 29 Aug 2026, and 62,280 dated project rows inside them.
- 1 project in California moved between our newest copy and the newest copy at least a week older than it (21 Aug 2026 → 29 Aug 2026). We do not answer this with our last two copies any more: the newest two we hold are CAISO 1 day apart, and finding nothing over one day is much weaker evidence than finding nothing over a week.
- The biggest single project in California in the newest copy is GEMINI WIND NORTH at 2,005.8 MW.
Real rows out of our sealed copies
These are rows we read out of dated copies we keep ourselves. The live source shows today only, so once a row moves, what it said before is gone from the place you would go to look.
| Project | Where | Size | What moved | Between |
|---|---|---|---|---|
| KINGSLEY SOLAR FARM | IMPERIAL | 360 MW | status ACTIVE → WITHDRAWN | 26 Aug 2026 → 27 Aug 2026 |
| MENIFEE POWER BANK | RIVERSIDE | 680 MW | status ACTIVE → COMPLETED | 17 Aug 2026 → 18 Aug 2026 |
| GREENWOOD ENERGY STORAGE | LOS ANGELES | 250 MW | status ACTIVE → WITHDRAWN | 12 Aug 2026 → 13 Aug 2026 |
| AZALEA | KERN | 60 MW | status ACTIVE → COMPLETED | 6 Aug 2026 → 9 Aug 2026 |
| CAPTIVA ENERGY STORAGE | ORANGE | 250 MW | status ACTIVE → WITHDRAWN | 23 Jul 2026 → 30 Jul 2026 |
| GNARLY OSAGE | SAN DIEGO | 300 MW | status ACTIVE → WITHDRAWN | 16 Jul 2026 → 23 Jul 2026 |
| DRIFTWOOD STELLA | KERN | 200 MW | status ACTIVE → WITHDRAWN | 16 Jul 2026 → 23 Jul 2026 |
| PASTORIA SOLAR | KERN | 105.2 MW | status ACTIVE → COMPLETED | 16 Jul 2026 → 23 Jul 2026 |
| CONAWAY HYBRID POWER PLANT | YOLO | 80 MW | status ACTIVE → WITHDRAWN | 16 Jul 2026 → 23 Jul 2026 |
| PALMETTO ENERGY STORAGE | ALAMEDA | 75 MW | status ACTIVE → WITHDRAWN | 16 Jul 2026 → 23 Jul 2026 |
| VALETUDO ENERGY STORAGE | MADERA | 75 MW | status ACTIVE → WITHDRAWN | 26 Jun 2026 → 2 Jul 2026 |
| SUNBEAM STORAGE | SAN MATEO | 65 MW | status ACTIVE → WITHDRAWN | 26 Jun 2026 → 2 Jul 2026 |
| Project | Where | What it is | Size | Status |
|---|---|---|---|---|
| GEMINI WIND NORTH | CA | Wind | 2,005.8 MW | WITHDRAWN |
| ALAMITOS ENERGY CENTER | LOS ANGELES | Gas | 1,902.9 MW | WITHDRAWN |
| EDGEWOOD SOLAR HYBRID | FRESNO | Battery | 1,700 MW | WITHDRAWN |
| EMPIRE | SAN BERNADINO | Battery | 1,600 MW | WITHDRAWN |
| INTREPID ENERGY | HUMBOLDT | Wind | 1,500.1 MW | WITHDRAWN |
| TEMPEST GENERATION | HUMBOLDT | Wind | 1,500 MW | WITHDRAWN |
| PINEBROOK SOLAR HYBRID ENERGY CENTER | FRESNO | Battery | 1,500 MW | WITHDRAWN |
| NIMITZ 1 GENERATION | SAN LUIS OBISPO | Battery | 1,500 MW | WITHDRAWN |
| NIMITZ 2 GENERATION | SAN LUIS OBISPO | Wind | 1,500 MW | WITHDRAWN |
| SEAWOLF GENERATION | SAN LUIS OBISPO | Battery | 1,500 MW | WITHDRAWN |
| HOLMAN | MONTEREY | Battery | 1,500 MW | ACTIVE |
| ISLAY | SAN LUIS OBISPO | Battery | 1,500 MW | WITHDRAWN |
Who published the data on this page
- Every row on this page was published by a grid operator, not by us. Written out in full, they are the California ISO. We keep dated copies of their public queue files; the projects, the names and the wording inside those rows are theirs.
- This file uses material published by the California ISO.
- Copyright © 2026 California Independent System Operator. All rights reserved.
- Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most".
What this page cannot tell you
- We read no in-service date out of the CAISO file: the column is empty on 2,278 of the 2,278 rows in our newest copy. So a CAISO move here is a status change or an entry or exit, never a date. If in-service dates are what you are buying this for, say so at operations@ustechautomations.com before you pay, because for CAISO we do not hold them.
- The operators write the same fuel differently — Solar, SOL, SUN and S all appear for the same thing. The fuel column is our reading of their labels, not their own count, and a label we are not sure of is shown as not clear rather than guessed at.
- A move here means two dated copies of the same public file disagree. It is not a decision, an approval, or a filing. If you need to know why a project moved, the operator is the place to ask, not us. Email operations@ustechautomations.com and we will send you both dated copies so you can check ours.
See the file before you pay
You do not have to take our word for what is in the file. Here are 17 rows of the real thing, carrying all 9 of its columns, cut out of the dated copies we sealed ourselves. Nothing in it is made up and nothing in it is tidied up.
- Open the 17 rows as a CSVA plain spreadsheet file. It saves to your machine rather than painting itself into a browser tab, and it opens in Excel, Numbers or Google Sheets.
- The same 17 rows as JSONThe same rows again, laid out for reading with code.
What arrives after you pay: a person emails you the whole file as a CSV — the same plain spreadsheet as the sample file above, not a login and not a web page — within one working day of your payment.
What you would be paying for: $49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, a person emails you the first California ISO what-moved file as a CSV within one working day, then a new one every week for as long as the subscription runs. Each file names the two sealed dates compared. If we could not collect that week, the file says so rather than repeating itself.
These 17 rows are a slice of the file, not the whole of it. What we cannot show you here is how far back it goes: that is the part you are paying for.
Subscribe to this feed
$49/mo · a new sealed copy every day
Subscribe — $49 a month$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, a person emails you the first California ISO what-moved file as a CSV within one working day, then a new one every week for as long as the subscription runs. Each file names the two sealed dates compared. If we could not collect that week, the file says so rather than repeating itself.
Rather ask first? Email operations@ustechautomations.com. Say that you want California and we will tell you which weeks we hold for it before you pay.
More from this feed
- Up one level: Queue changesThe whole feed, its price, and how the file arrives.
- What is and is not in this feedEvery source we read for it, how often, and the ones we refuse to collect.