Newest sealed read: 2026-10-14. We read this source every day. We hold 73 sealed runs going back to 2026-06-11.
What this page is151,548 rows held · newest sealed read 2026-10-14
- 2,076 power projects in California sit in the newest copy we hold of this waiting list: CAISO.
- We hold 73 dated copies covering California, the first from 11 Jun 2026 and the most recent read on 14 Oct 2026, and 151,548 dated project rows inside them.
- Nothing in California changed between our newest copy and the newest copy at least a week older than it (7 Oct 2026 → 14 Oct 2026). The table above is the most recent set of moves we do hold, and every row names the two dates it sits between. We do not answer this with our last two copies any more: the newest two we hold are CAISO 1 day apart, and finding nothing over one day is much weaker evidence than finding nothing over a week.
- The biggest single project in California in the newest copy is GEMINI WIND NORTH at 2,005.8 MW.
Real rows out of our sealed copies
These are rows we read out of dated copies we keep ourselves. The live source shows today only, so once a row moves, what it said before is gone from the place you would go to look.
| Project | Where | Size | What moved | Between |
|---|---|---|---|---|
| JEWELFLOWER STORAGE | SANTA CLARA | 350 MW | status ACTIVE → WITHDRAWN | 6 Oct 2026 → 7 Oct 2026 |
| CLARKSON | FRESNO | 200 MW | in-service 30 Sep 2029 → 9 Feb 2029 | 1 Oct 2026 → 2 Oct 2026 |
| OVERNIGHT SOLAR | SAN BERNARDINO | 150 MW | in-service 15 Sep 2026 → 13 Nov 2026 | 1 Oct 2026 → 2 Oct 2026 |
| REDUX SOLAR | FRESNO | 125 MW | in-service 1 Jun 2026 → 30 Nov 2028 | 1 Oct 2026 → 2 Oct 2026 |
| LOTUS SOLAR 2 | MADERA | 200 MW | in-service 17 Nov 2030 → 4 Jan 2032 | 30 Sep 2026 → 1 Oct 2026 |
| IRVING STORAGE | MONTEREY | 750 MW | in-service 30 Nov 2025 → 1 Aug 2030 | 25 Sep 2026 → 26 Sep 2026 |
| KETTLE SOLAR ONE | SAN DIEGO | 90 MW | in-service 13 Jan 2027 → 13 Mar 2027 | 22 Sep 2026 → 23 Sep 2026 |
| JANUS | COLUSA | 80 MW | in-service 1 Mar 2027 → 1 Apr 2027 | 21 Sep 2026 → 22 Sep 2026 |
| AJO POWER BANK | SANTA CLARA | 120 MW | status ACTIVE → WITHDRAWN | 18 Sep 2026 → 19 Sep 2026 |
| ELECTRON | LOS ANGELES | 300 MW | status ACTIVE → WITHDRAWN | 17 Sep 2026 → 18 Sep 2026 |
| GASKELL WEST | KERN | 125 MW | in-service 30 Jun 2026 → 30 Dec 2026 | 17 Sep 2026 → 18 Sep 2026 |
| SERENA STORAGE | KERN | 110 MW | in-service 18 Sep 2029 → 16 Feb 2032 | 15 Sep 2026 → 16 Sep 2026 |
| Project | Where | What it is | Size | Status |
|---|---|---|---|---|
| GEMINI WIND NORTH | CA | Wind | 2,005.8 MW | WITHDRAWN |
| ALAMITOS ENERGY CENTER | LOS ANGELES | Gas | 1,902.9 MW | WITHDRAWN |
| EDGEWOOD SOLAR HYBRID | FRESNO | Battery | 1,700 MW | WITHDRAWN |
| EMPIRE | SAN BERNADINO | Battery | 1,600 MW | WITHDRAWN |
| INTREPID ENERGY | HUMBOLDT | Wind | 1,500.1 MW | WITHDRAWN |
| TEMPEST GENERATION | HUMBOLDT | Wind | 1,500 MW | WITHDRAWN |
| PINEBROOK SOLAR HYBRID ENERGY CENTER | FRESNO | Battery | 1,500 MW | WITHDRAWN |
| NIMITZ 1 GENERATION | SAN LUIS OBISPO | Battery | 1,500 MW | WITHDRAWN |
| NIMITZ 2 GENERATION | SAN LUIS OBISPO | Wind | 1,500 MW | WITHDRAWN |
| SEAWOLF GENERATION | SAN LUIS OBISPO | Battery | 1,500 MW | WITHDRAWN |
| HOLMAN | MONTEREY | Battery | 1,500 MW | ACTIVE |
| ISLAY | SAN LUIS OBISPO | Battery | 1,500 MW | WITHDRAWN |
Who published the data on this page
- Every row on this page was published by a grid operator, not by us. Written out in full, they are the California ISO. We keep dated copies of their public queue files; the projects, the names and the wording inside those rows are theirs.
- This file uses material published by the California ISO.
- Copyright © 2026 California Independent System Operator. All rights reserved.
- Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most".
What this page cannot tell you
- We first read the in-service date out of the CAISO file on 11 Sep 2026, so no copy before that day holds one. It is filled in on 2,260 of the 2,278 rows in our 14 Oct 2026 copy (the other 18 are blank), and a change to it is a move like any other. If in-service dates are what you are buying this for, say so at operations@ustechautomations.com before you pay.
- The operators write the same fuel differently — Solar, SOL, SUN and S all appear for the same thing. The fuel column is our reading of their labels, not their own count, and a label we are not sure of is shown as not clear rather than guessed at.
- A move here means two dated copies of the same public file disagree. It is not a decision, an approval, or a filing. If you need to know why a project moved, the operator is the place to ask, not us. Email operations@ustechautomations.com and we will send you both dated copies so you can check ours.
See the file before you pay
You do not have to take our word for what is in the file. Here are 25 rows of the real thing, carrying all 9 of its columns, cut out of the dated copies we sealed ourselves. Nothing in it is made up and nothing in it is tidied up.
- Open the 25 rows as a CSVA plain spreadsheet file. It saves to your machine rather than painting itself into a browser tab, and it opens in Excel, Numbers or Google Sheets.
- The same 25 rows as JSONThe same rows again, laid out for reading with code.
What arrives after you pay: Stripe sends you to the receipt page. A job that checks for new payments every 10 minutes puts the newest weekly California ISO CSV there and adds each later week's file while your subscription is active; if no weekly file has been built yet, the page says so. It compares successfully collected source copies and names any gaps. A failed source read creates no new dated file. Nobody emails you. The subscriber CSV adds source and coverage columns to the compact preview shown here. A coverage row records the comparison dates and any gaps, including when no changes were observed.
What you would be paying for: $49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. A dated file is built from successful CAISO seals when available. When the two comparison copies have no tracked-field moves, the file holds one coverage row only (the two comparison dates, the row count and content hash of each workbook, and a note on whether every date in between was fetched) and no project rows; a failed or missing source read creates no new dated file and remains an explicit gap. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, Stripe sends you to your receipt page, where a job that checks for new payments every 10 minutes puts the newest weekly file. A dated CSV appears only after successfully collected source copies; each file names the two sealed dates compared and its source hashes. If an intervening source read fails, the gap is reported and no new dated file is created from that failure.
These 25 rows are a slice of the file, not the whole of it. What we cannot show you here is how far back it goes: that is the part you are paying for.
Subscribe to this feed
$49/mo · a new sealed copy every day
Subscribe — $49 a month$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. A dated file is built from successful CAISO seals when available. When the two comparison copies have no tracked-field moves, the file holds one coverage row only (the two comparison dates, the row count and content hash of each workbook, and a note on whether every date in between was fetched) and no project rows; a failed or missing source read creates no new dated file and remains an explicit gap. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, Stripe sends you to your receipt page, where a job that checks for new payments every 10 minutes puts the newest weekly file. A dated CSV appears only after successfully collected source copies; each file names the two sealed dates compared and its source hashes. If an intervening source read fails, the gap is reported and no new dated file is created from that failure.
Rather ask first? Email operations@ustechautomations.com. Say that you want California and we will tell you which weeks we hold for it before you pay.
More from this feed
- Up one level: Queue changesThe whole feed, its price, and how the file arrives.
- What is and is not in this feedEvery source we read for it, how often, and the ones we refuse to collect.