Energy and siting Queue changes 4,840 rows held

Interconnection queue changes in Illinois

This page is not part of the subscription. Over 56 days of collection this queue produced 47 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it. The table below is every move we hold for Illinois: 74 of them across 10 dated copies going back to 11 Jun 2026, and every row names the two dates it sits between.

Price
$49/mo
Built for
Energy researchers, journalists, interconnection-software vendors
Read
About every week
Newest sealed read
2026-08-06

Subscribe — $49 a month$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period.

Newest sealed read: 2026-08-06. We read this source about every 7 days. We hold 10 sealed runs going back to 2026-06-11. Collection has paused. We last read this source 24 days ago, and we read it about every 7 days, so no number on this page moves until collection starts again.

What this page is4,840 rows held · newest sealed read 2026-08-06

  • This page is not part of the subscription. Over 56 days of collection this queue produced 47 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it.
  • 492 power projects in Illinois sit in the newest copy we hold of this waiting list: MISO.
  • We hold 10 dated copies covering Illinois, the first from 11 Jun 2026 and the most recent read on 6 Aug 2026, and 4,840 dated project rows inside them.
  • 1 project in Illinois moved between our newest copy and the newest copy at least a week older than it (30 Jul 2026 → 6 Aug 2026).
  • The biggest single project in Illinois in the newest copy is Austin Substation 345kV Bus at 1,165 MW.

Real rows out of our sealed copies

These are rows we read out of dated copies we keep ourselves. The live source shows today only, so once a row moves, what it said before is gone from the place you would go to look.

12 of 74 moves we hold for Illinois, newest first — the rest are in the dated copies we keep. None of this page is in the weekly file each row names its own two dates
ProjectWhereSizeWhat movedBetween
Fargo to Sandburg 345kVPeoria250 MWstatus Pending Revision Approval → Active30 Jul 2026 → 6 Aug 2026
Bloomington BrokawPeoria300 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
West Frankfort East 345 kV (7E W FKFT)Franklin300 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
7CLINTON - 7BROKAW 345.0kVPeoria300 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
4GILMAN-4PAXTON E 138kVIroquois265 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
7FARADAY - 7PANA 345.0kVChristian250 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
4PAXTON - 4J845POI 138.0kVFord200 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
Sugar Creek - Cayuga CT 345.0kVEdgar200 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
Cincinnati 138 kV SubstationTazewell198 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
RedhawkMontgomery195 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
RisingChampaign191.3 MWstatus Withdrawn → Active23 Jul 2026 → 30 Jul 2026
Ipava 138 kV SubstationFulton180 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
The 12 biggest projects in Illinois, out of 492 — whatever status the file gives them read 6 Aug 2026
ProjectWhereWhat it isSizeStatus
Austin Substation 345kV BusSangamon CountyGas1,165 MWDone
Ipava-Maple Ridge 345kV (4573)FultonSolar820.6 MWActive
Meredosia - Austin 345 kV Line tapMacoupin County,Morgan County,Sangamon CountySolar592.8 MWDone
Aster to CommodorePerrySolar500 MWActive
Other_WashingtonMore than one kind500 MWActive
7COFFEEN - 7PANA 345.0kVChristianMore than one kind500 MWActive
08GIBSON (PSI) - 7ALBION 345.0kVWabashMore than one kind500 MWPending Revision Approval
Casey - Kansas West 345kV LineClark CountyMore than one kind408.6 MWDone
Gilman - Watseka 138kVIroquoisMore than one kind400 MWActive
Ipava 138kVFultonMore than one kind350 MWActive
NeogaShelbyWind350 MWActive
7FARGO - 7SANDBURG 345.0kVPeoriaWind350 MWActive

Who published the data on this page

  • Every row on this page was published by a grid operator, not by us. Written out in full, they are Midcontinent Independent System Operator. We keep dated copies of their public queue files; the projects, the names and the wording inside those rows are theirs.
  • This file uses material published by the California ISO.
  • Copyright © 2026 California Independent System Operator. All rights reserved.
  • Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most".

What this page cannot tell you

  • This is our last copy of the MISO file. We sealed it on 6 Aug 2026 and we have not asked for it since, so every row and every date here stays exactly where it is. We are not promising you another one. Nothing is trying to fetch it, so nothing here is going to move on its own. If we start reading it again the date at the top changes and you will see it.
  • The operators write the same fuel differently — Solar, SOL, SUN and S all appear for the same thing. The fuel column is our reading of their labels, not their own count, and a label we are not sure of is shown as not clear rather than guessed at.
  • A move here means two dated copies of the same public file disagree. It is not a decision, an approval, or a filing. If you need to know why a project moved, the operator is the place to ask, not us. Email operations@ustechautomations.com and we will send you both dated copies so you can check ours.

See the file before you pay

You do not have to take our word for what is in the file. Here are 17 rows of the real thing, carrying all 9 of its columns, cut out of the dated copies we sealed ourselves. Nothing in it is made up and nothing in it is tidied up.

  • Open the 17 rows as a CSVA plain spreadsheet file. It saves to your machine rather than painting itself into a browser tab, and it opens in Excel, Numbers or Google Sheets.
  • The same 17 rows as JSONThe same rows again, laid out for reading with code.

What arrives after you pay: a person emails you the whole file as a CSV — the same plain spreadsheet as the sample file above, not a login and not a web page — within one working day of your payment.

What you would be paying for: $49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, a person emails you the first California ISO what-moved file as a CSV within one working day, then a new one every week for as long as the subscription runs. Each file names the two sealed dates compared. If we could not collect that week, the file says so rather than repeating itself.

These 17 rows are a slice of the file, not the whole of it. What we cannot show you here is how far back it goes: that is the part you are paying for.

Subscribe to this feed

$49/mo · a closed set of dated copies to 6 Aug 2026, not being added to

Subscribe — $49 a month

$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, a person emails you the first California ISO what-moved file as a CSV within one working day, then a new one every week for as long as the subscription runs. Each file names the two sealed dates compared. If we could not collect that week, the file says so rather than repeating itself.

Rather ask first? Email operations@ustechautomations.com. Say that you want Illinois and we will tell you which weeks we hold for it before you pay.

More from this feed