Newest sealed read: 2026-08-29. We read this source every day. We hold 31 sealed runs going back to 2026-06-11.
What this page is54,162 rows held · newest sealed read 2026-08-29
- This page is not part of the subscription. Over 79 days of collection this queue produced 8 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it.
- ISO-NE runs the power grid in New England.
- We hold 31 dated copies of the ISO-NE file, the first from 11 Jun 2026 and the newest from 29 Aug 2026, and 54,162 dated project rows inside them. The newest copy lists 1,747 projects.
- Where those projects sit, by count: Massachusetts 605, Maine 407, Connecticut 321, New Hampshire 138, Rhode Island 123.
- 1 project in the ISO-NE queue moved between our newest copy and the newest copy at least a week older than it (22 Aug 2026 → 29 Aug 2026). We do not answer this with our last two copies any more: the newest two we hold are ISO-NE 1 day apart, and finding nothing over one day is much weaker evidence than finding nothing over a week.
- Worth knowing before you build this yourself: we hold 31 dated copies of the ISO-NE file, so there are 30 gaps between them. The file itself came back different across 29 of those gaps, but a project had actually moved in only 7. Saving the files is the easy half. Telling which projects moved is the work.
Real rows out of our sealed copies
These are rows we read out of dated copies we keep ourselves. The live source shows today only, so once a row moves, what it said before is gone from the place you would go to look.
| Project | Where | Size | What moved | Between |
|---|---|---|---|---|
| Nutes Solar | Strafford, NH | 20 MW | in-service 22 Sep 2026 → 28 Sep 2026 | 24 Aug 2026 → 25 Aug 2026 |
| Twin Energy Wind | Oxford, ME | 18.3 MW | in-service 6 Nov 2026 → 4 Dec 2026 | 19 Aug 2026 → 20 Aug 2026 |
| FPS Panton Solar | Addison, VT | 50 MW | in-service 1 Dec 2027 → 1 Dec 2029 | 17 Aug 2026 → 18 Aug 2026 |
| Fair Haven Solar | Rutland, VT | 20 MW | in-service 1 Jul 2027 → 1 Jul 2028 | 17 Aug 2026 → 18 Aug 2026 |
| Shaftsbury Solar | Bennington, VT | 20 MW | in-service 1 Jan 2028 → 1 Jan 2029 | 17 Aug 2026 → 18 Aug 2026 |
| Grissom Solar | Sullivan, NH | 5 MW | in-service 26 Aug 2026 → 2 Sep 2026 | 30 Jul 2026 → 6 Aug 2026 |
| Solar | Somerset, ME | 140 MW | size 164.6 MW → 140 MW | 9 Jul 2026 → 16 Jul 2026 |
| Husky Solar | Windham, CT | 50.2 MW | in-service 10 May 2029 → 10 May 2030 | 9 Jul 2026 → 16 Jul 2026 |
| Grissom Solar | Sullivan, NH | 5 MW | in-service 5 Aug 2026 → 26 Aug 2026 | 9 Jul 2026 → 16 Jul 2026 |
| Hecate Energy Eastern Ave Energy Center | Suffolk, MA | 250 MW | in-service 31 Aug 2027 → 14 Dec 2027 | 2 Jul 2026 → 9 Jul 2026 |
| Battery Storage | Litchfield, CT | 141.6 MW | in-service 30 May 2028 → 1 Jun 2029 | 2 Jul 2026 → 9 Jul 2026 |
| Grissom Solar | Sullivan, NH | 5 MW | in-service 22 Jul 2026 → 5 Aug 2026 | 18 Jun 2026 → 25 Jun 2026 |
| Project | Where | What it is | Size |
|---|---|---|---|
| Non-controllable objective ETU to enable 2400 MW injection | New London, CT | not given | 2,400 MW |
| 345 kV AC line | Bristol, MA | not given | 1,600 MW |
| 1400 MW HVDC Line into Millstone | New London, CT | not given | 1,400 MW |
| New Scotland BESS (NYISO-C24-045) | Albany, NY | Battery | 1,350 MW |
| Offshore wind | MA | Wind | 1,320 MW |
| Offshore wind | MA | Wind | 1,309 MW |
| Offshore Wind | CT | Wind | 1,275 MW |
| Offshore Wind | CT | Wind | 1,275 MW |
| Offshore Wind | CT | Wind | 1,200 MW |
| Offshore Wind | MA | Wind | 1,200 MW |
| SouthCoast Wind 1 | MA | Wind | 1,200 MW |
| Offshore wind | MA | Wind | 1,200 MW |
Who published the data on this page
- Every row on this page was published by a grid operator, not by us. Written out in full, they are ISO New England. We keep dated copies of their public queue files; the projects, the names and the wording inside those rows are theirs.
- This file uses material published by the California ISO.
- Copyright © 2026 California Independent System Operator. All rights reserved.
- Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most".
What this page cannot tell you
- An ISO-NE move on this page is never a status change, and that is our fault rather than a gap in ISO-NE's file. ISO-NE does publish a status on its rows. We save the wrong column out of the file, so the status is empty on all 54,162 ISO-NE rows we hold and no page here can see a status change. We are fixing our end. Size and in-service date are read correctly and are what an ISO-NE move here is made of.
- ISO-NE prints the same queue number on more than one line, so when one of those lines is dropped the project itself has not gone anywhere. We look for the queue number in the newer copy before we say a project left, which is why 5 rows that would otherwise read here as a departure are not shown. Every one of those queue numbers is still in the file today.
- The operators write the same fuel differently — Solar, SOL, SUN and S all appear for the same thing. The fuel column is our reading of their labels, not their own count, and a label we are not sure of is shown as not clear rather than guessed at.
- A move here means two dated copies of the same public file disagree. It is not a decision, an approval, or a filing. If you need to know why a project moved, the operator is the place to ask, not us. Email operations@ustechautomations.com and we will send you both dated copies so you can check ours.
See the file before you pay
You do not have to take our word for what is in the file. Here are 17 rows of the real thing, carrying all 9 of its columns, cut out of the dated copies we sealed ourselves. Nothing in it is made up and nothing in it is tidied up.
- Open the 17 rows as a CSVA plain spreadsheet file. It saves to your machine rather than painting itself into a browser tab, and it opens in Excel, Numbers or Google Sheets.
- The same 17 rows as JSONThe same rows again, laid out for reading with code.
What arrives after you pay: a person emails you the whole file as a CSV — the same plain spreadsheet as the sample file above, not a login and not a web page — within one working day of your payment.
What you would be paying for: $49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, a person emails you the first California ISO what-moved file as a CSV within one working day, then a new one every week for as long as the subscription runs. Each file names the two sealed dates compared. If we could not collect that week, the file says so rather than repeating itself.
These 17 rows are a slice of the file, not the whole of it. What we cannot show you here is how far back it goes: that is the part you are paying for.
Subscribe to this feed
$49/mo · a new sealed copy every day
Subscribe — $49 a month$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, a person emails you the first California ISO what-moved file as a CSV within one working day, then a new one every week for as long as the subscription runs. Each file names the two sealed dates compared. If we could not collect that week, the file says so rather than repeating itself.
Rather ask first? Email operations@ustechautomations.com. Say that you want ISO-NE and we will tell you which weeks we hold for it before you pay.