Interconnection queue changes in Louisiana

This page is not part of the subscription. Over 56 days of collection this queue produced 16 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it. The table below is every move we hold for Louisiana: 27 of them across 10 dated copies going back to 11 Jun 2026, and every row names the two dates it sits between.

Price
$49/mo
Built for
Energy researchers, journalists, interconnection-software vendors
Read
About every week
Newest sealed read
2026-08-06

Subscribe — $49 a month$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. A dated file is built from successful CAISO seals when available. When the two comparison copies have no tracked-field moves, the file holds one coverage row only (the two comparison dates, the row count and content hash of each workbook, and a note on whether every date in between was fetched) and no project rows; a failed or missing source read creates no new dated file and remains an explicit gap. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period.

Newest sealed read: 2026-08-06. We read this source about every 7 days. We hold 10 sealed runs going back to 2026-06-11. Collection has paused. We last read this source 70 days ago, and we read it about every 7 days, so no number on this page moves until collection starts again.

What this page is3,828 rows held · newest sealed read 2026-08-06

  • This page is not part of the subscription. Over 56 days of collection this queue produced 16 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it.
  • 386 power projects in Louisiana sit in the newest copy we hold of this waiting list: MISO.
  • We hold 10 dated copies covering Louisiana, the first from 11 Jun 2026 and the most recent read on 6 Aug 2026, and 3,828 dated project rows inside them.
  • 1 project in Louisiana moved between our newest copy and the newest copy at least a week older than it (30 Jul 2026 → 6 Aug 2026).
  • The biggest single project in Louisiana in the newest copy is Bayou Labutte 500kV Substation at 705 MW.

Real rows out of our sealed copies

These are rows we read out of dated copies we keep ourselves. The live source shows today only, so once a row moves, what it said before is gone from the place you would go to look.

12 of 27 moves we hold for Louisiana, newest first — the rest are in the dated copies we keep. None of this page is in the weekly file each row names its own two dates
ProjectWhereSizeWhat movedBetween
PRAIRIE ROADOuachita80 MWstatus Pending Revision Approval → Active30 Jul 2026 → 6 Aug 2026
DUNN - OAK RIDGE (LA) 115.0kVMorehouse250 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
DARNELL - TALLULAH 115.0kVEast Carroll200 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
Taping the 'Galion / 3GALION (337444)' to 'Oak Grove / 3OAK_GROVE! (337445)' 115kV lineMorehouse160 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
WATERFORD 230 SWYD - VACHERIE 230.0kVSt. John the Baptist150 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
BOGALUSA - DEXTER SS (CE) 115.0kVWashington150 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
Galion 115 kV SubstationMorehouse100 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
1673 Interconnection SubstationSabine92 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
PATERSONOrleans40 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
Doc Bonin 69kVLafayette243.1 MWstatus Pending Revision Approval → Active9 Jul 2026 → 16 Jul 2026
Cooper - Leesville 138.0kVRapides280 MWstatus Active → Pending Revision Approval2 Jul 2026 → 9 Jul 2026
DUNN - OAK RIDGE (LA) 115.0kVMorehouse250 MWstatus Active → Pending Revision Approval2 Jul 2026 → 9 Jul 2026
The 12 biggest projects in Louisiana, out of 386 — whatever status the file gives them read 6 Aug 2026
ProjectWhereWhat it isSizeStatus
Bayou Labutte 500kV SubstationIberville ParishGas705 MWDone
SmallingRichlandSolar600 MWActive
CargasOuachitaSolar500 MWActive
CargasOuachitaSolar500 MWActive
MCKNIGHT - PLANT DANIEL 500.0kVSt. TammanyMore than one kind450 MWActive
MCKNIGHT - PLANT DANIEL 500.0kVSt. HelenaMore than one kind400 MWDone
MCKNIGHT - PLANT DANIEL 500.0kVSt. HelenaMore than one kind400 MWWithdrawn
HinestonRapidesSolar350 MWActive
Goos FerryCalcasieuSolar325 MWDone
Moler 230 kV SubstationEast Feliciana ParishSolar300 MWDone
BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kVMorehouseSolar300 MWActive
WellsSt. LandryBattery300 MWActive

Who published the data on this page

  • Every row on this page was published by a grid operator, not by us. Written out in full, they are Midcontinent Independent System Operator. We keep dated copies of their public queue files; the projects, the names and the wording inside those rows are theirs.
  • This file uses material published by the California ISO.
  • Copyright © 2026 California Independent System Operator. All rights reserved.
  • Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most".

What this page cannot tell you

  • This is our last copy of the MISO file. We sealed it on 6 Aug 2026 and we have not asked for it since, so every row and every date here stays exactly where it is. We are not promising you another one. Nothing is trying to fetch it, so nothing here is going to move on its own. If we start reading it again the date at the top changes and you will see it.
  • The operators write the same fuel differently — Solar, SOL, SUN and S all appear for the same thing. The fuel column is our reading of their labels, not their own count, and a label we are not sure of is shown as not clear rather than guessed at.
  • A move here means two dated copies of the same public file disagree. It is not a decision, an approval, or a filing. If you need to know why a project moved, the operator is the place to ask, not us. Email operations@ustechautomations.com and we will send you both dated copies so you can check ours.

See the file before you pay

You do not have to take our word for what is in the file. Here are 25 rows of the real thing, carrying all 9 of its columns, cut out of the dated copies we sealed ourselves. Nothing in it is made up and nothing in it is tidied up.

  • Open the 25 rows as a CSVA plain spreadsheet file. It saves to your machine rather than painting itself into a browser tab, and it opens in Excel, Numbers or Google Sheets.
  • The same 25 rows as JSONThe same rows again, laid out for reading with code.

What arrives after you pay: Stripe sends you to the receipt page. A job that checks for new payments every 10 minutes puts the newest weekly California ISO CSV there and adds each later week's file while your subscription is active; if no weekly file has been built yet, the page says so. It compares successfully collected source copies and names any gaps. A failed source read creates no new dated file. Nobody emails you. The subscriber CSV adds source and coverage columns to the compact preview shown here. A coverage row records the comparison dates and any gaps, including when no changes were observed.

What you would be paying for: $49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. A dated file is built from successful CAISO seals when available. When the two comparison copies have no tracked-field moves, the file holds one coverage row only (the two comparison dates, the row count and content hash of each workbook, and a note on whether every date in between was fetched) and no project rows; a failed or missing source read creates no new dated file and remains an explicit gap. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, Stripe sends you to your receipt page, where a job that checks for new payments every 10 minutes puts the newest weekly file. A dated CSV appears only after successfully collected source copies; each file names the two sealed dates compared and its source hashes. If an intervening source read fails, the gap is reported and no new dated file is created from that failure.

These 25 rows are a slice of the file, not the whole of it. What we cannot show you here is how far back it goes: that is the part you are paying for.

Subscribe to this feed

$49/mo · a closed set of dated copies to 6 Aug 2026, not being added to

Subscribe — $49 a month

$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. A dated file is built from successful CAISO seals when available. When the two comparison copies have no tracked-field moves, the file holds one coverage row only (the two comparison dates, the row count and content hash of each workbook, and a note on whether every date in between was fetched) and no project rows; a failed or missing source read creates no new dated file and remains an explicit gap. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, Stripe sends you to your receipt page, where a job that checks for new payments every 10 minutes puts the newest weekly file. A dated CSV appears only after successfully collected source copies; each file names the two sealed dates compared and its source hashes. If an intervening source read fails, the gap is reported and no new dated file is created from that failure.