US Tech Automations

Energy and siting Queue changes 37,937 rows held

What moved in the MISO queue

This page is not part of the subscription. Over 56 days of collection this queue produced 265 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it. Our last copy of the MISO file is dated 6 Aug 2026 and we have not asked for it since — the freshest file in this feed, CAISO, has a copy dated 29 Aug 2026, 23 days newer. The table below is what was in that last copy.

Price
$49/mo
Built for
Energy researchers, journalists, interconnection-software vendors
Read
About every week
Newest sealed read
2026-08-06

Subscribe — $49 a month$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period.

Newest sealed read: 2026-08-06. We read this source about every 7 days. We hold 10 sealed runs going back to 2026-06-11. Collection has paused. We last read this source 24 days ago, and we read it about every 7 days, so no number on this page moves until collection starts again.

What this page is37,937 rows held · newest sealed read 2026-08-06

  • This page is not part of the subscription. Over 56 days of collection this queue produced 265 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it.
  • MISO runs the power grid across parts of the Midwest and the South. Our last copy of its file is dated 6 Aug 2026 and we have not asked for it since — the freshest file in this feed, CAISO, has a copy dated 29 Aug 2026, 23 days newer — so this page is that last copy and what moved on the way to it.
  • We hold 10 dated copies of the MISO file, the first from 11 Jun 2026 and the newest from 6 Aug 2026, and 37,937 dated project rows inside them. The newest copy lists 3,803 projects.
  • Where those projects sit, by count: Michigan 530, Illinois 492, Indiana 468, Arkansas 404, Louisiana 386.
  • 17 projects in the MISO queue moved between our newest copy and the newest copy at least a week older than it (30 Jul 2026 → 6 Aug 2026).
  • Worth knowing before you build this yourself: we hold 10 dated copies of the MISO file, so there are 9 gaps between them. The file itself came back different across 8 of those gaps, but a project had actually moved in only 8. Saving the files is the easy half. Telling which projects moved is the work.

Real rows out of our sealed copies

These are rows we read out of dated copies we keep ourselves. The live source shows today only, so once a row moves, what it said before is gone from the place you would go to look.

12 of 439 moves we hold for the MISO queue, newest first — the rest are in the dated copies we keep. None of this page is in the weekly file 30 Jul 2026 → 6 Aug 2026
ProjectWhereSizeWhat moved
Fargo to Sandburg 345kVPeoria, IL250 MWstatus Pending Revision Approval → Active
North Rochester - Briggs Road 345.0kVWabasha, MN200 MWstatus Pending Revision Approval → Active
LAKEOVER EHV - MCADAMS EHV 500.0kVMadison, MS188 MWstatus Pending Revision Approval → Active
LAKEOVER EHV - MCADAMS EHV 500.0kVMadison, MS169 MWstatus Pending Revision Approval → Active
Magee 161 - White Oak 161.0kVSimpson, MS165 MWstatus Pending Revision Approval → Active
Oakland City - Old Ben Coal 138.0kVGibson, IN150 MWstatus Active → Pending Transfer
GILMORE - WILSON 161.0kVCrittenden, AR150 MWstatus Pending Revision Approval → Active
Jackson North 161kV SubstationJackson, MN150 MWstatus Pending Revision Approval → Active
MACEDONIA - TAYLOR 115.0kVColumbia, AR140 MWstatus Pending Revision Approval → Active
Plummer PipeRed Lake, MN130 MWstatus Pending Revision Approval → Active
LAKEOVER EHV - MCADAMS EHV 500.0kVMadison, MS100 MWstatus Pending Revision Approval → Active
PRAIRIE ROADOuachita, LA80 MWstatus Pending Revision Approval → Active
The 12 biggest projects in the MISO queue, out of 3,803 — whatever status the file gives them read 6 Aug 2026
ProjectWhereWhat it isSizeStatus
SIOUXSt. Charles, MOGas2,200 MWActive
Sugar Creek - Cayuga CT 345.0kVVermillion, INGas1,540 MWActive
BLACKFOOT - MADRID 345.0kVLivingston, MIGas1,452 MWPending Revision Approval
HIPLEBranch, MIGas1,445 MWPending Revision Approval
Majestic-Milan 345 kV LineWashtenaw, MIGas1,414 MWActive
Belle River - Fitz #2 345 kV Line TapSt. Clair County, MIGas1,209 MWDone
North Madison 345/138 kVDane, WIGas1,203 MWActive
Other_Kenosha, WIGas1,203 MWActive
Austin Substation 345kV BusSangamon County, ILGas1,165 MWDone
Astoria 345kV substationDeuel, SDGas1,144 MWActive
McCredie - Montgomery 345 kV Line TapRandolph County, MOnot given1,000 MWDone
THETFORDGenesee, MIGas975.4 MWActive

Who published the data on this page

  • Every row on this page was published by a grid operator, not by us. Written out in full, they are Midcontinent Independent System Operator. We keep dated copies of their public queue files; the projects, the names and the wording inside those rows are theirs.
  • This file uses material published by the California ISO.
  • Copyright © 2026 California Independent System Operator. All rights reserved.
  • Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most".

What this page cannot tell you

  • This is our last copy of the MISO file. We sealed it on 6 Aug 2026 and we have not asked for it since, so every row and every date here stays exactly where it is. We are not promising you another one. Nothing is trying to fetch it, so nothing here is going to move on its own. If we start reading it again the date at the top changes and you will see it.
  • The operators write the same fuel differently — Solar, SOL, SUN and S all appear for the same thing. The fuel column is our reading of their labels, not their own count, and a label we are not sure of is shown as not clear rather than guessed at.
  • A move here means two dated copies of the same public file disagree. It is not a decision, an approval, or a filing. If you need to know why a project moved, the operator is the place to ask, not us. Email operations@ustechautomations.com and we will send you both dated copies so you can check ours.

See the file before you pay

You do not have to take our word for what is in the file. Here are 17 rows of the real thing, carrying all 9 of its columns, cut out of the dated copies we sealed ourselves. Nothing in it is made up and nothing in it is tidied up.

  • Open the 17 rows as a CSVA plain spreadsheet file. It saves to your machine rather than painting itself into a browser tab, and it opens in Excel, Numbers or Google Sheets.
  • The same 17 rows as JSONThe same rows again, laid out for reading with code.

What arrives after you pay: a person emails you the whole file as a CSV — the same plain spreadsheet as the sample file above, not a login and not a web page — within one working day of your payment.

What you would be paying for: $49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, a person emails you the first California ISO what-moved file as a CSV within one working day, then a new one every week for as long as the subscription runs. Each file names the two sealed dates compared. If we could not collect that week, the file says so rather than repeating itself.

These 17 rows are a slice of the file, not the whole of it. What we cannot show you here is how far back it goes: that is the part you are paying for.

Subscribe to this feed

$49/mo · a closed set of dated copies to 6 Aug 2026, not being added to

Subscribe — $49 a month

$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, a person emails you the first California ISO what-moved file as a CSV within one working day, then a new one every week for as long as the subscription runs. Each file names the two sealed dates compared. If we could not collect that week, the file says so rather than repeating itself.

Rather ask first? Email operations@ustechautomations.com. Say that you want MISO and we will tell you which weeks we hold for it before you pay.

More from this feed