US Tech Automations

Energy and siting Queue changes 44,302 rows held

Interconnection queue changes in New York

This page is not part of the subscription. Over 79 days of collection this queue produced 17 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it. The table below is every move we hold for New York: 17 of them across 31 dated copies going back to 11 Jun 2026, and every row names the two dates it sits between.

Price
$49/mo
Built for
Energy researchers, journalists, interconnection-software vendors
Read
Every day
Newest sealed read
2026-08-29

Subscribe — $49 a month$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period.

Newest sealed read: 2026-08-29. We read this source every day. We hold 31 sealed runs going back to 2026-06-11.

What this page is44,302 rows held · newest sealed read 2026-08-29

  • This page is not part of the subscription. Over 79 days of collection this queue produced 17 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it.
  • 1,613 power projects in New York sit in the newest copy we hold of each of these waiting lists: NYISO, ISO-NE.
  • We hold 31 dated copies covering New York, the first from 11 Jun 2026 and the most recent read on 29 Aug 2026, and 44,302 dated project rows inside them.
  • Each operator here has its own newest copy: NYISO 29 Aug 2026 (1,600 projects); ISO-NE 29 Aug 2026 (13 projects).
  • Nothing in New York changed between our newest copy and the newest copy at least a week older than it (NYISO 22 Aug 2026 → 29 Aug 2026; ISO-NE 22 Aug 2026 → 29 Aug 2026). The table above is the most recent set of moves we do hold, and every row names the two dates it sits between. We do not answer this with our last two copies any more: the newest two we hold are NYISO 1 day, ISO-NE 1 day apart, and finding nothing over one day is much weaker evidence than finding nothing over a week.
  • The biggest single project in New York in the newest copy is Blue Sky Interconnect 2 at 2,620 MW.

Real rows out of our sealed copies

These are rows we read out of dated copies we keep ourselves. The live source shows today only, so once a row moves, what it said before is gone from the place you would go to look.

12 of 17 moves we hold for New York, newest first — the rest are in the dated copies we keep. None of this page is in the weekly file each row names its own two dates
ProjectWhereSizeWhat movedBetween
Flat Creek SolarMontgomery200 MWstatus Active → Withdrawn12 Aug 2026 → 13 Aug 2026
Oxbow Hill SolarMadison140 MWin-service 01-2027 → 06-202912 Aug 2026 → 13 Aug 2026
Flat Creek SolarMontgomery100 MWstatus Active → Withdrawn12 Aug 2026 → 13 Aug 2026
Luyster Creek Energy Storage 1Queens56.3 MWin-service 01-2027 → 04-202812 Aug 2026 → 13 Aug 2026
Buttercup WindChautauqua49.9 MWno longer in this file12 Aug 2026 → 13 Aug 2026
Cuba Solar FarmAllegany20 MWnew in this file12 Aug 2026 → 13 Aug 2026
Stern SolarRenssalear20 MWnew in this file12 Aug 2026 → 13 Aug 2026
NY37 SolarJefferson20 MWin-service 04-2028 → 09-202812 Aug 2026 → 13 Aug 2026
Dolan SolarWashington20 MWin-service 05-2027 → 09-202712 Aug 2026 → 13 Aug 2026
Levy Grid, LLCErie150 MWstatus Active → Withdrawn9 Jul 2026 → 16 Jul 2026
High Bridge WindChenango100.8 MWstatus Active → Withdrawn9 Jul 2026 → 16 Jul 2026
Massena LoadSt. Lawrence100 MWno longer in this file9 Jul 2026 → 16 Jul 2026
The 12 biggest projects in New York, out of 1,613 — whatever status the file gives them read 29 Aug 2026
ProjectOperatorWhereWhat it isSizeStatus
Blue Sky Interconnect 2NYISOBrooklynWind2,620 MWWithdrawn
Atlantic Shores Offshore Wind Bight 1NYISOKingsWind2,100 MWWithdrawn
Atlantic Shores Offshore Wind Bight 2NYISORichmondWind2,100 MWWithdrawn
Atlantic Shores Offshore Wind Bight 3NYISOSuffolkWind2,100 MWWithdrawn
Atlantic Shores Offshore Wind Bight 4NYISOKingsWind2,100 MWWithdrawn
Atlantic Shores Offshore Wind Bight 5NYISORichmondWind2,100 MWWithdrawn
Empire ConnectionNYISONYTransmission line2,000 MWWithdrawn
Empire Connection DCNYISONYnot given2,000 MWWithdrawn
Clay HVDCNYISONYTransmission line2,000 MWWithdrawn
Clay HVDCNYISOOnondaga/NYTransmission line2,000 MWWithdrawn
PhoenixNYISOOneida-Manhattan & BronxTransmission line2,000 MWWithdrawn
HG-PhoenixNYISOErie, Onondaga,NY, KIngsTransmission line2,000 MWWithdrawn

Who published the data on this page

  • Every row on this page was published by a grid operator, not by us. Written out in full, they are ISO New England and New York ISO. We keep dated copies of their public queue files; the projects, the names and the wording inside those rows are theirs.
  • This file uses material published by the California ISO.
  • Copyright © 2026 California Independent System Operator. All rights reserved.
  • Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most".

What this page cannot tell you

  • An ISO-NE move on this page is never a status change, and that is our fault rather than a gap in ISO-NE's file. ISO-NE does publish a status on its rows. We save the wrong column out of the file, so the status is empty on all 54,162 ISO-NE rows we hold and no page here can see a status change. We are fixing our end. Size and in-service date are read correctly and are what an ISO-NE move here is made of.
  • When NYISO moves a project onto its withdrawn sheet, the in-service date disappears from the file, because that sheet has no such column. The date did not slip. We count that as the one withdrawal it is rather than a status change plus a date change, so 5 rows you might expect to see twice appear once.
  • The operators write the same fuel differently — Solar, SOL, SUN and S all appear for the same thing. The fuel column is our reading of their labels, not their own count, and a label we are not sure of is shown as not clear rather than guessed at.
  • A move here means two dated copies of the same public file disagree. It is not a decision, an approval, or a filing. If you need to know why a project moved, the operator is the place to ask, not us. Email operations@ustechautomations.com and we will send you both dated copies so you can check ours.

See the file before you pay

You do not have to take our word for what is in the file. Here are 17 rows of the real thing, carrying all 9 of its columns, cut out of the dated copies we sealed ourselves. Nothing in it is made up and nothing in it is tidied up.

  • Open the 17 rows as a CSVA plain spreadsheet file. It saves to your machine rather than painting itself into a browser tab, and it opens in Excel, Numbers or Google Sheets.
  • The same 17 rows as JSONThe same rows again, laid out for reading with code.

What arrives after you pay: a person emails you the whole file as a CSV — the same plain spreadsheet as the sample file above, not a login and not a web page — within one working day of your payment.

What you would be paying for: $49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, a person emails you the first California ISO what-moved file as a CSV within one working day, then a new one every week for as long as the subscription runs. Each file names the two sealed dates compared. If we could not collect that week, the file says so rather than repeating itself.

These 17 rows are a slice of the file, not the whole of it. What we cannot show you here is how far back it goes: that is the part you are paying for.

Subscribe to this feed

$49/mo · a new sealed copy every day

Subscribe — $49 a month

$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, a person emails you the first California ISO what-moved file as a CSV within one working day, then a new one every week for as long as the subscription runs. Each file names the two sealed dates compared. If we could not collect that week, the file says so rather than repeating itself.

Rather ask first? Email operations@ustechautomations.com. Say that you want New York and we will tell you which weeks we hold for it before you pay.

More from this feed