US Tech Automations

Energy and siting Queue changes 45,865 rows held

What moved in the NYISO queue

This page is not part of the subscription. Over 64 days of collection this queue produced 18 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it. The table below is what is in the list today.

Price
$49/mo
Built for
Energy researchers, journalists, interconnection-software vendors
Read
Every day
Newest sealed read
2026-08-29

Subscribe — $49 a month$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period.

Newest sealed read: 2026-08-29. We read this source every day. We hold 28 sealed runs going back to 2026-06-26.

What this page is45,865 rows held · newest sealed read 2026-08-29

  • This page is not part of the subscription. Over 64 days of collection this queue produced 18 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it.
  • NYISO runs the power grid in New York.
  • We hold 28 dated copies of the NYISO file, the first from 26 Jun 2026 and the newest from 29 Aug 2026, and 45,865 dated project rows inside them. The newest copy lists 1,638 projects.
  • Where those projects sit, by count: New York 1,600, Pennsylvania 28, New Jersey 8, Connecticut 1, Delaware 1.
  • Nothing in the NYISO queue changed between our newest copy and the newest copy at least a week older than it (22 Aug 2026 → 29 Aug 2026). The table above is the most recent set of moves we do hold, and every row names the two dates it sits between. We do not answer this with our last two copies any more: the newest two we hold are NYISO 1 day apart, and finding nothing over one day is much weaker evidence than finding nothing over a week.
  • Worth knowing before you build this yourself: we hold 28 dated copies of the NYISO file, so there are 27 gaps between them. The file itself came back different across 2 of those gaps, but a project had actually moved in only 2. Saving the files is the easy half. Telling which projects moved is the work.

Real rows out of our sealed copies

These are rows we read out of dated copies we keep ourselves. The live source shows today only, so once a row moves, what it said before is gone from the place you would go to look.

12 of 18 moves we hold for the NYISO queue, newest first — the rest are in the dated copies we keep. None of this page is in the weekly file each row names its own two dates
ProjectWhereSizeWhat movedBetween
Flat Creek SolarMontgomery, NY200 MWstatus Active → Withdrawn12 Aug 2026 → 13 Aug 2026
Oxbow Hill SolarMadison, NY140 MWin-service 01-2027 → 06-202912 Aug 2026 → 13 Aug 2026
Flat Creek SolarMontgomery, NY100 MWstatus Active → Withdrawn12 Aug 2026 → 13 Aug 2026
Luyster Creek Energy Storage 1Queens, NY56.3 MWin-service 01-2027 → 04-202812 Aug 2026 → 13 Aug 2026
Buttercup WindChautauqua, NY49.9 MWno longer in this file12 Aug 2026 → 13 Aug 2026
Cuba Solar FarmAllegany, NY20 MWnew in this file12 Aug 2026 → 13 Aug 2026
Stern SolarRenssalear, NY20 MWnew in this file12 Aug 2026 → 13 Aug 2026
NY37 SolarJefferson, NY20 MWin-service 04-2028 → 09-202812 Aug 2026 → 13 Aug 2026
Dolan SolarWashington, NY20 MWin-service 05-2027 → 09-202712 Aug 2026 → 13 Aug 2026
Mineral Basin Solar PowerClearfield, PA401.6 MWin-service 12-2028 → 12-20299 Jul 2026 → 16 Jul 2026
Levy Grid, LLCErie, NY150 MWstatus Active → Withdrawn9 Jul 2026 → 16 Jul 2026
High Bridge WindChenango, NY100.8 MWstatus Active → Withdrawn9 Jul 2026 → 16 Jul 2026
The 12 biggest projects in the NYISO queue, out of 1,638 — whatever status the file gives them read 29 Aug 2026
ProjectWhereWhat it isSizeStatus
Blue Sky Interconnect 2Brooklyn, NYWind2,620 MWWithdrawn
Atlantic Shores Offshore Wind Bight 1Kings, NYWind2,100 MWWithdrawn
Atlantic Shores Offshore Wind Bight 2Richmond, NYWind2,100 MWWithdrawn
Atlantic Shores Offshore Wind Bight 3Suffolk, NYWind2,100 MWWithdrawn
Atlantic Shores Offshore Wind Bight 4Kings, NYWind2,100 MWWithdrawn
Atlantic Shores Offshore Wind Bight 5Richmond, NYWind2,100 MWWithdrawn
Empire ConnectionNYTransmission line2,000 MWWithdrawn
Empire Connection DCNYnot given2,000 MWWithdrawn
Clay HVDCNY, NYTransmission line2,000 MWWithdrawn
Clay HVDCOnondaga/NY, NYTransmission line2,000 MWWithdrawn
PhoenixOneida-Manhattan & Bronx, NYTransmission line2,000 MWWithdrawn
HG-PhoenixErie, Onondaga,NY, KIngs, NYTransmission line2,000 MWWithdrawn

Who published the data on this page

  • Every row on this page was published by a grid operator, not by us. Written out in full, they are New York ISO. We keep dated copies of their public queue files; the projects, the names and the wording inside those rows are theirs.
  • This file uses material published by the California ISO.
  • Copyright © 2026 California Independent System Operator. All rights reserved.
  • Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most".

What this page cannot tell you

  • When NYISO moves a project onto its withdrawn sheet, the in-service date disappears from the file, because that sheet has no such column. The date did not slip. We count that as the one withdrawal it is rather than a status change plus a date change, so 5 rows you might expect to see twice appear once.
  • The operators write the same fuel differently — Solar, SOL, SUN and S all appear for the same thing. The fuel column is our reading of their labels, not their own count, and a label we are not sure of is shown as not clear rather than guessed at.
  • A move here means two dated copies of the same public file disagree. It is not a decision, an approval, or a filing. If you need to know why a project moved, the operator is the place to ask, not us. Email operations@ustechautomations.com and we will send you both dated copies so you can check ours.

See the file before you pay

You do not have to take our word for what is in the file. Here are 17 rows of the real thing, carrying all 9 of its columns, cut out of the dated copies we sealed ourselves. Nothing in it is made up and nothing in it is tidied up.

  • Open the 17 rows as a CSVA plain spreadsheet file. It saves to your machine rather than painting itself into a browser tab, and it opens in Excel, Numbers or Google Sheets.
  • The same 17 rows as JSONThe same rows again, laid out for reading with code.

What arrives after you pay: a person emails you the whole file as a CSV — the same plain spreadsheet as the sample file above, not a login and not a web page — within one working day of your payment.

What you would be paying for: $49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, a person emails you the first California ISO what-moved file as a CSV within one working day, then a new one every week for as long as the subscription runs. Each file names the two sealed dates compared. If we could not collect that week, the file says so rather than repeating itself.

These 17 rows are a slice of the file, not the whole of it. What we cannot show you here is how far back it goes: that is the part you are paying for.

Subscribe to this feed

$49/mo · a new sealed copy every day

Subscribe — $49 a month

$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, a person emails you the first California ISO what-moved file as a CSV within one working day, then a new one every week for as long as the subscription runs. Each file names the two sealed dates compared. If we could not collect that week, the file says so rather than repeating itself.

Rather ask first? Email operations@ustechautomations.com. Say that you want NYISO and we will tell you which weeks we hold for it before you pay.

More from this feed