Newest sealed read: 2026-08-29. We read this source every day. We hold 30 sealed runs going back to 2026-06-11.
What this page is30,404 rows held · newest sealed read 2026-08-29
- This page is not part of the subscription. Over 79 days of collection this queue produced 0 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it.
- SPP runs the power grid across parts of the central United States.
- We hold 30 dated copies of the SPP file, the first from 11 Jun 2026 and the newest from 29 Aug 2026, and 30,404 dated project rows inside them. The newest copy lists 1,027 projects. Where those projects sit, by count: Oklahoma 315, Kansas 182, Nebraska 117, Texas 109, Colorado 80.
- 5 projects in the SPP queue moved between our newest copy and the newest copy at least a week older than it (22 Aug 2026 → 29 Aug 2026). We do not answer this with our last two copies any more: the newest two we hold are SPP 1 day apart, and finding nothing over one day is much weaker evidence than finding nothing over a week.
- One day we asked and came back with nothing usable: on 13 Aug 2026 the file came back at only 4,880 bytes, far short of a full list, with no projects in it. We sealed no copy for that day, so it is skipped rather than compared against, and the rows either side of it are compared to each other.
- Worth knowing before you build this yourself: we hold 30 dated copies of the SPP file, so there are 29 gaps between them. The file itself came back different across 22 of those gaps, but a project had actually moved in only 19. Saving the files is the easy half. Telling which projects moved is the work.
Real rows out of our sealed copies
These are rows we read out of dated copies we keep ourselves. The live source shows today only, so once a row moves, what it said before is gone from the place you would go to look.
| Queue number | Where | Size | What moved | Between |
|---|---|---|---|---|
| GEN-2026-SR32 | Saint Joseph, MO | 400 MW | in-service 15 Dec 2028 → 31 Dec 2028 | 26 Aug 2026 → 27 Aug 2026 |
| GEN-2026-SR31 | Saint Joseph, MO | 400 MW | in-service 15 Dec 2028 → 31 Dec 2028 | 26 Aug 2026 → 27 Aug 2026 |
| ERAS-2025-001 | Lancaster, NE | 104 MW | status ERAS → IA FULLY EXECUTED/ON SCHEDULE | 26 Aug 2026 → 27 Aug 2026 |
| GEN-2017-198 | Omaha, NE | 11.6 MW | no longer in this file | 26 Aug 2026 → 27 Aug 2026 |
| GEN-2023-037 | Wyandotte, KS | 200 MW | status IA PENDING → IA FULLY EXECUTED/ON SCHEDULE | 24 Aug 2026 → 25 Aug 2026 |
| GEN-2023-037 | Wyandotte, KS | 200 MW | in-service 1 Jul 2028 → 30 Aug 2029 | 24 Aug 2026 → 25 Aug 2026 |
| GEN-2016-087 | Campbell, SD | 98.6 MW | size 98.9 MW → 98.6 MW | 21 Aug 2026 → 22 Aug 2026 |
| GEN-2016-087 | Campbell, SD | 98.6 MW | in-service 31 Dec 2026 → 31 Dec 2028 | 21 Aug 2026 → 22 Aug 2026 |
| AFS NJG-2026-001 | Clay, MO | 9.9 MW | new in this file | 17 Aug 2026 → 18 Aug 2026 |
| AFS NJG-2025-006 | Jackson, MO | 9.9 MW | new in this file | 17 Aug 2026 → 18 Aug 2026 |
| AFS NJG-2025-002 | Buchanan, MO | 9.9 MW | new in this file | 17 Aug 2026 → 18 Aug 2026 |
| AFS NJG-2025-001 | Jackson, MO | 9.9 MW | new in this file | 17 Aug 2026 → 18 Aug 2026 |
| Queue number | Where | What it is | Size | Status |
|---|---|---|---|---|
| GEN-2024-340 | Creek, OK | Gas | 1,400 MW | DISIS STAGE |
| GEN-2024-377 | Harrison, TX | Gas | 1,350 MW | DISIS STAGE |
| GEN-2024-379 | Bossier Parish, LA | Gas | 1,350 MW | DISIS STAGE |
| GEN-2024-341 | Pittsburgh, OK | Gas | 1,045 MW | DISIS STAGE |
| GEN-2020-065 | Gaines, NM | Gas | 1,003 MW | IA FULLY EXECUTED/ON SCHEDULE |
| GEN-2023-204 | Morris, TX | Gas | 914.6 MW | IA PENDING |
| GEN-2024-129 | Labette, KS | Gas | 910 MW | DISIS STAGE |
| GEN-2004-008 | Platte County, MO | Coal | 850 MW | IA FULLY EXECUTED/COMMERCIAL OPERATION |
| GI-CS-2025-25 | Platte County,, WY | Solar and battery | 800 MW | DISIS STAGE |
| ERAS-2025-004 | Harrah, OK | Gas | 779 MW | ERAS |
| GEN-2024-207 | Missouri, MO | Gas | 778.6 MW | DISIS STAGE |
| ERAS-2025-011 | Stanton, ND | Gas | 750 MW | ERAS |
Who published the data on this page
- Every row on this page was published by a grid operator, not by us. Written out in full, they are Southwest Power Pool. We keep dated copies of their public queue files; the projects, the names and the wording inside those rows are theirs.
- The Southwest Power Pool allows their material to be copied and passed on only with a proper credit, and only outside a commercial publication. So, plainly: this page uses material published by the Southwest Power Pool, and this page is not for sale.
- This file uses material published by the California ISO.
- Copyright © 2026 California Independent System Operator. All rights reserved.
- Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most".
What this page cannot tell you
- SPP publishes no plant name at all. Every SPP row here is a number the operator itself uses — the queue number, like GEN-2024-340. The name column is empty on 826 of the 1,027 rows in its newest copy, and on the other 201 it holds a second study number rather than a name. Both numbers travel in the file you buy. We do not invent a name for a row that has none.
- The operators write the same fuel differently — Solar, SOL, SUN and S all appear for the same thing. The fuel column is our reading of their labels, not their own count, and a label we are not sure of is shown as not clear rather than guessed at.
- A move here means two dated copies of the same public file disagree. It is not a decision, an approval, or a filing. If you need to know why a project moved, the operator is the place to ask, not us. Email operations@ustechautomations.com and we will send you both dated copies so you can check ours.
See the file we hold
You do not have to take our word for what is in the file. Here are 17 rows of the real thing, carrying all 9 of its columns, cut out of the dated copies we sealed ourselves. Nothing in it is made up and nothing in it is tidied up.
- Open the 17 rows as a CSVA plain spreadsheet file. It saves to your machine rather than painting itself into a browser tab, and it opens in Excel, Numbers or Google Sheets.
- The same 17 rows as JSONThe same rows again, laid out for reading with code.
Nothing on this page is for sale. The sample file is free to read, and so is every row on the page above it.
These 17 rows are a slice of the file, not the whole of it. What we cannot show you here is how far back it goes: the file goes back further than these rows do.
This page is not for sale
Nothing is sold from this page. Email operations@ustechautomations.com. The rows above include material whose publisher permits copying only outside a commercial publication, so nothing is sold from this page. We reply with what we hold for this one, and with what we do not hold.
Email us about the copies we holdSay that you want SPP and we will tell you which weeks we hold for it and since when.
More from this feed
- Up one level: Queue changesThe whole feed, its price, and how the file arrives.
- What is and is not in this feedEvery source we read for it, how often, and the ones we refuse to collect.