Energy and siting Queue changes 17,445 rows held

Interconnection queue changes in Texas

This page is not part of the subscription. Over 56 days of collection this queue produced 4 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it. The table below is every move we hold for Texas: 6 of them across 10 dated copies going back to 11 Jun 2026, and every row names the two dates it sits between. 95% of the projects here sit in the ERCOT list. Our last copy of that is dated 30 Jul 2026 and we have not asked for it since, so treat this page as complete to that date.

Price
$49/mo
Built for
Energy researchers, journalists, interconnection-software vendors
Read
About every week
Newest sealed read
2026-07-30

Subscribe — $49 a month$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. A dated file is built from successful CAISO seals when available. When the two comparison copies have no tracked-field moves, the file holds one coverage row only (the two comparison dates, the row count and content hash of each workbook, and a note on whether every date in between was fetched) and no project rows; a failed or missing source read creates no new dated file and remains an explicit gap. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period.

Newest sealed read: 2026-07-30. We read this source about every 7 days. We hold 10 sealed runs going back to 2026-06-11. Collection has paused. We last read this source 77 days ago, and we read it about every 7 days, so no number on this page moves until collection starts again.

What this page is17,445 rows held · newest sealed read 2026-07-30

  • This page is not part of the subscription. Over 56 days of collection this queue produced 4 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it.
  • 1,930 power projects in Texas sit in the newest copy we hold of each of these waiting lists: ERCOT, MISO. We hold 10 dated copies covering Texas, the first from 11 Jun 2026 and the most recent read on 6 Aug 2026, and 17,445 dated project rows inside them. The picture on this page is complete only as of 30 Jul 2026. ERCOT has 1,839 of the 1,930 projects in Texas — 95% of them — and we have not been able to read that list since then. The rest of the page is current to 6 Aug 2026.
  • Each operator here has its own newest copy: ERCOT 30 Jul 2026 (1,839 projects); MISO 6 Aug 2026 (91 projects).
  • Nothing in Texas changed between our newest copy and the newest copy at least a week older than it (ERCOT 23 Jul 2026 → 30 Jul 2026; MISO 30 Jul 2026 → 6 Aug 2026). The table above is the most recent set of moves we do hold, and every row names the two dates it sits between.
  • The ERCOT file that carries the projects was identical on all 9 of our reads — the same file, down to the byte — so there was nothing in it to move.
  • The biggest single project in Texas in the newest copy is Prairie Ridge (Gas - CC) at 1,660.4 MW.

Real rows out of our sealed copies

These are rows we read out of dated copies we keep ourselves. The live source shows today only, so once a row moves, what it said before is gone from the place you would go to look.

All 6 moves we hold for Texas, out of every dated copy we have. None of this page is in the weekly file each row names its own two dates
ProjectWhereSizeWhat movedBetween
Cypress 138 kV SubstationHardin200 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
ONALASKATrinity150 MWstatus Active → Pending Revision Approval9 Jul 2026 → 16 Jul 2026
RhodairJefferson0 MWstatus Active → Withdrawn9 Jul 2026 → 16 Jul 2026
Cypress 138 kV SubstationHardin200 MWstatus Active → Pending Revision Approval26 Jun 2026 → 2 Jul 2026
138kV Bragg - SHECO Menard LinePolk170 MWstatus Pending Revision Approval → Active26 Jun 2026 → 2 Jul 2026
138kV Bragg - SHECO Menard LinePolk170 MWstatus Active → Pending Revision Approval18 Jun 2026 → 25 Jun 2026
The 12 biggest projects in Texas, out of 1,930 — whatever status the file gives them newest copy of each file, 30 Jul 2026 to 6 Aug 2026
ProjectOperatorWhereWhat it isSizeStatus
Prairie Ridge (Gas - CC)ERCOTFranklinGas1,660.4 MWSS Completed, FIS Started, No IA
Hecate Energy Orem WindERCOTBrazoriaWind1,542 MWSS Completed, FIS Started, No IA
Aegle PowerERCOTCameronGas1,536.4 MWSS Completed, FIS Started, No IA
Big Canyon WindERCOTPecosWind1,500 MWSS Completed, FIS Started, IA
Caldwell County Energy CenterERCOTCaldwellGas1,500 MWSS Completed, FIS Started, No IA
BasRanch (TEF - Due Diligence)ERCOTWardGas1,350 MWSS Completed, FIS Completed, IA
STP Unit2 High Pressure Turbine UpgradeERCOTMatagordaNuclear1,336.5 MWSS Started, FIS Started, No IA
Moon HammerERCOTWheelerGas1,300 MWSS Completed, FIS Started, IA
The Giant Arc-IIERCOTPecosGas1,300 MWSS Started, FIS Started, No IA
The Giant Arc IERCOTPecosGas1,300 MWSS Started, FIS Started, No IA
Sandow Lakes Energy StationERCOTMilamGas1,291.6 MWSS Completed, FIS Started, No IA
Jewett Energy Center 1 GasERCOTFreestoneGas1,274 MWSS Completed, FIS Started, No IA

Who published the data on this page

  • Every row on this page was published by a grid operator, not by us. Written out in full, they are Midcontinent Independent System Operator and Electric Reliability Council of Texas. We keep dated copies of their public queue files; the projects, the names and the wording inside those rows are theirs.
  • This file uses material published by the California ISO.
  • Copyright © 2026 California Independent System Operator. All rights reserved.
  • Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most".

What this page cannot tell you

  • This is our last copy of the ERCOT file. We sealed it on 30 Jul 2026 and we have not asked for it since, so every row and every date here stays exactly where it is. We are not promising you another one. Nothing is trying to fetch it, so nothing here is going to move on its own. If we start reading it again the date at the top changes and you will see it.
  • This is our last copy of the MISO file. We sealed it on 6 Aug 2026 and we have not asked for it since, so every row and every date here stays exactly where it is. We are not promising you another one. Nothing is trying to fetch it, so nothing here is going to move on its own. If we start reading it again the date at the top changes and you will see it.
  • The operators write the same fuel differently — Solar, SOL, SUN and S all appear for the same thing. The fuel column is our reading of their labels, not their own count, and a label we are not sure of is shown as not clear rather than guessed at.
  • A move here means two dated copies of the same public file disagree. It is not a decision, an approval, or a filing. If you need to know why a project moved, the operator is the place to ask, not us. Email operations@ustechautomations.com and we will send you both dated copies so you can check ours.

See the file before you pay

You do not have to take our word for what is in the file. Here are 25 rows of the real thing, carrying all 9 of its columns, cut out of the dated copies we sealed ourselves. Nothing in it is made up and nothing in it is tidied up.

  • Open the 25 rows as a CSVA plain spreadsheet file. It saves to your machine rather than painting itself into a browser tab, and it opens in Excel, Numbers or Google Sheets.
  • The same 25 rows as JSONThe same rows again, laid out for reading with code.

What arrives after you pay: Stripe sends you to the receipt page. A job that checks for new payments every 10 minutes puts the newest weekly California ISO CSV there and adds each later week's file while your subscription is active; if no weekly file has been built yet, the page says so. It compares successfully collected source copies and names any gaps. A failed source read creates no new dated file. Nobody emails you. The subscriber CSV adds source and coverage columns to the compact preview shown here. A coverage row records the comparison dates and any gaps, including when no changes were observed.

What you would be paying for: $49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. A dated file is built from successful CAISO seals when available. When the two comparison copies have no tracked-field moves, the file holds one coverage row only (the two comparison dates, the row count and content hash of each workbook, and a note on whether every date in between was fetched) and no project rows; a failed or missing source read creates no new dated file and remains an explicit gap. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, Stripe sends you to your receipt page, where a job that checks for new payments every 10 minutes puts the newest weekly file. A dated CSV appears only after successfully collected source copies; each file names the two sealed dates compared and its source hashes. If an intervening source read fails, the gap is reported and no new dated file is created from that failure.

These 25 rows are a slice of the file, not the whole of it. What we cannot show you here is how far back it goes: that is the part you are paying for.

Subscribe to this feed

$49/mo · a closed set of dated copies to 6 Aug 2026, not being added to

Subscribe — $49 a month

$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. A dated file is built from successful CAISO seals when available. When the two comparison copies have no tracked-field moves, the file holds one coverage row only (the two comparison dates, the row count and content hash of each workbook, and a note on whether every date in between was fetched) and no project rows; a failed or missing source read creates no new dated file and remains an explicit gap. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, Stripe sends you to your receipt page, where a job that checks for new payments every 10 minutes puts the newest weekly file. A dated CSV appears only after successfully collected source copies; each file names the two sealed dates compared and its source hashes. If an intervening source read fails, the gap is reported and no new dated file is created from that failure.

Rather ask first? Email operations@ustechautomations.com. Say that you want Texas and we will tell you which weeks we hold for it before you pay.

More from this feed