Energy and siting Queue changes 2,358 rows held

Interconnection queue changes in Wisconsin

This page is not part of the subscription. Over 56 days of collection this queue produced 12 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it. The table below is every move we hold for Wisconsin: 19 of them across 10 dated copies going back to 11 Jun 2026, and every row names the two dates it sits between.

Price
$49/mo
Built for
Energy researchers, journalists, interconnection-software vendors
Read
About every week
Newest sealed read
2026-08-06

Subscribe — $49 a month$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period.

Newest sealed read: 2026-08-06. We read this source about every 7 days. We hold 10 sealed runs going back to 2026-06-11. Collection has paused. We last read this source 24 days ago, and we read it about every 7 days, so no number on this page moves until collection starts again.

What this page is2,358 rows held · newest sealed read 2026-08-06

  • This page is not part of the subscription. Over 56 days of collection this queue produced 12 named movers. We keep the dated copies and this page stays here, but we are not selling it, and the weekly file does not include it.
  • 247 power projects in Wisconsin sit in the newest copy we hold of this waiting list: MISO.
  • We hold 10 dated copies covering Wisconsin, the first from 11 Jun 2026 and the most recent read on 6 Aug 2026, and 2,358 dated project rows inside them.
  • 1 project in Wisconsin moved between our newest copy and the newest copy at least a week older than it (30 Jul 2026 → 6 Aug 2026).
  • The biggest single project in Wisconsin in the newest copy is North Madison 345/138 kV at 1,203 MW.

Real rows out of our sealed copies

These are rows we read out of dated copies we keep ourselves. The live source shows today only, so once a row moves, what it said before is gone from the place you would go to look.

12 of 19 moves we hold for Wisconsin, newest first — the rest are in the dated copies we keep. None of this page is in the weekly file each row names its own two dates
ProjectWhereSizeWhat movedBetween
Alma Center- Merrillan (DCP) 69 KVJackson0 MWstatus Active → Withdrawn30 Jul 2026 → 6 Aug 2026
Forest JunctionCalumet650 MWstatus Pending Transfer → Active23 Jul 2026 → 30 Jul 2026
Brick Church 138 kVWalworth100 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
Other_Kenosha50 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
North Madison 69kV SubstationDane50 MWstatus Pending Revision Approval → Active23 Jul 2026 → 30 Jul 2026
STONE LAKESawyer243.6 MWstatus Pending Revision Approval → Active9 Jul 2026 → 16 Jul 2026
Columbia-North Madison 345kVColumbia300 MWstatus Pending Revision Approval → Active2 Jul 2026 → 9 Jul 2026
STONE LAKESawyer243.6 MWstatus Active → Pending Revision Approval2 Jul 2026 → 9 Jul 2026
New J1502 TO Switching Station (Emerson)Juneau200 MWstatus Pending Revision Approval → Active2 Jul 2026 → 9 Jul 2026
Brick Church 138 kVWalworth100 MWstatus Active → Pending Revision Approval2 Jul 2026 → 9 Jul 2026
Other_Kenosha50 MWstatus Active → Pending Revision Approval2 Jul 2026 → 9 Jul 2026
Forest JunctionCalumet650 MWstatus Active → Pending Transfer26 Jun 2026 → 2 Jul 2026
The 12 biggest projects in Wisconsin, out of 247 — whatever status the file gives them read 6 Aug 2026
ProjectWhereWhat it isSizeStatus
North Madison 345/138 kVDaneGas1,203 MWActive
Other_KenoshaGas1,203 MWActive
Sugar Creek 345 kVWalworthGas950 MWActive
Forest JunctionCalumetGas650 MWActive
Arrowhead - Stone Lake 345kV LineDouglas CountyGas561.5 MWDone
South Fond du Lac - Fitzgerald 345.0kVFond du LacGas525 MWActive
Stone Lake - Gardner Park 345.0kVRuskSolar416.5 MWActive
Pleasant Prairie - Racine 345kV Line TapKenosha County,Racine CountySolar400 MWWithdrawn
Arcadian - Zion 345kV Line TapKenosha County,Racine CountySolar400 MWWithdrawn
Arcadian - Zion 345kV Line TapKenosha County,Racine CountySolar400 MWWithdrawn
Columbia - Rockdale 345.0kVColumbiaBattery400 MWActive
Rocky Run to Werner West 345 kVPortageSolar399 MWActive

Who published the data on this page

  • Every row on this page was published by a grid operator, not by us. Written out in full, they are Midcontinent Independent System Operator. We keep dated copies of their public queue files; the projects, the names and the wording inside those rows are theirs.
  • This file uses material published by the California ISO.
  • Copyright © 2026 California Independent System Operator. All rights reserved.
  • Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most".

What this page cannot tell you

  • This is our last copy of the MISO file. We sealed it on 6 Aug 2026 and we have not asked for it since, so every row and every date here stays exactly where it is. We are not promising you another one. Nothing is trying to fetch it, so nothing here is going to move on its own. If we start reading it again the date at the top changes and you will see it.
  • The operators write the same fuel differently — Solar, SOL, SUN and S all appear for the same thing. The fuel column is our reading of their labels, not their own count, and a label we are not sure of is shown as not clear rather than guessed at.
  • A move here means two dated copies of the same public file disagree. It is not a decision, an approval, or a filing. If you need to know why a project moved, the operator is the place to ask, not us. Email operations@ustechautomations.com and we will send you both dated copies so you can check ours.

See the file before you pay

You do not have to take our word for what is in the file. Here are 17 rows of the real thing, carrying all 9 of its columns, cut out of the dated copies we sealed ourselves. Nothing in it is made up and nothing in it is tidied up.

  • Open the 17 rows as a CSVA plain spreadsheet file. It saves to your machine rather than painting itself into a browser tab, and it opens in Excel, Numbers or Google Sheets.
  • The same 17 rows as JSONThe same rows again, laid out for reading with code.

What arrives after you pay: a person emails you the whole file as a CSV — the same plain spreadsheet as the sample file above, not a login and not a web page — within one working day of your payment.

What you would be paying for: $49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, a person emails you the first California ISO what-moved file as a CSV within one working day, then a new one every week for as long as the subscription runs. Each file names the two sealed dates compared. If we could not collect that week, the file says so rather than repeating itself.

These 17 rows are a slice of the file, not the whole of it. What we cannot show you here is how far back it goes: that is the part you are paying for.

Subscribe to this feed

$49/mo · a closed set of dated copies to 6 Aug 2026, not being added to

Subscribe — $49 a month

$49 a month, billed monthly, for dated what-moved files of the California ISO interconnection queue only. Not the Southwest Power Pool, not ISO New England, not the New York ISO, and not a four-queue blend. One file a week, built from daily seals. A week with no tracked-field moves is still sent: added 0, removed 0, changed 0, plus the two content hashes of the workbooks compared. This file uses material published by the California ISO. Copyright © 2026 California Independent System Operator. All rights reserved. Their terms say "Most of the materials", not all. This file does not claim the Public Queue Report is inside that "Most". Cancel any month by email, with no account to close and no notice period. After you pay, a person emails you the first California ISO what-moved file as a CSV within one working day, then a new one every week for as long as the subscription runs. Each file names the two sealed dates compared. If we could not collect that week, the file says so rather than repeating itself.

Rather ask first? Email operations@ustechautomations.com. Say that you want Wisconsin and we will tell you which weeks we hold for it before you pay.

More from this feed