Interconnection queue › Connecticut › Hartford County
Snapshot of 2026-08-06 · 57 projects · Connecticut (CT)
There are 57 projects in the interconnection queue located in Hartford County, Connecticut (CT), totalling 3,025 MW across the 53 that publish a capacity.
Get told what moves in Hartford County, Connecticut
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Hartford County, Connecticut: what entered, what moved study phase, what came off the list.
Email me Hartford County, Connecticut queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 57 | 3,025 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| SUN | 25 | 992 MW |
| BAT | 14 | 1,832 MW |
| NG | 5 | 54 MW |
| DFO NG | 3 | 0 MW |
| FC | 3 | 17 MW |
| SUN BAT | 3 | 125 MW |
| (not published) | 2 | not published |
| MSW | 2 | 4 MW |
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 57 | 3,025 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Battery Storage | ISO-NE | 326 | not published | 7/7/2023 | 2/2/2029 |
| Battery Storage | ISO-NE | 238 | not published | 12/12/2023 | 1/31/2027 |
| Battery Storage | ISO-NE | 238 | not published | 5/6/2024 | 1/31/2027 |
| Battery Storage | ISO-NE | 196 | not published | 1/12/2023 | 9/15/2026 |
| Battery Storage | ISO-NE | 167 | not published | 4/1/2024 | 4/1/2028 |
| Solar | ISO-NE | 150 | not published | 3/31/2022 | 10/31/2028 |
| Solar | ISO-NE | 135 | not published | 9/10/2020 | 10/31/2022 |
| Battery Storage | ISO-NE | 133 | not published | 6/4/2024 | 4/1/2028 |
| Battery Storage | ISO-NE | 125 | not published | 8/10/2022 | 4/1/2027 |
| Battery Storage | ISO-NE | 102 | not published | 5/18/2023 | 12/31/2026 |
| Solar | ISO-NE | 101 | not published | 8/16/2021 | 10/15/2024 |
| Broadleaf Solar | ISO-NE | 101 | not published | 11/4/2021 | 10/15/2027 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.