Interconnection queue › Connecticut

Connecticut Interconnection Queue

Snapshot of 2026-07-30 · 322 projects · ISO-NE, NYISO

There are 322 projects in the interconnection queue with a Connecticut location, totalling 38,967 MW across the 246 that publish a capacity.

Technology in Connecticut

Get told what moves in Connecticut

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Connecticut: what entered, what moved study phase, what came off the list.

Email me Connecticut queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE32138,947 MW (from 245 of 321 projects)
NYISO120 MW

By fuel, as published

Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.

FuelProjectsCapacity
BAT618,296 MW
NG613,516 MW (from 44 of 61 projects)
SUN561,487 MW
DFO NG427,240 MW (from 31 of 42 projects)
(not published)34not published
N/A138,500 MW (from 7 of 13 projects)
WND117,764 MW (from 10 of 11 projects)
DFO6538 MW (from 4 of 6 projects)
NUC5136 MW (from 3 of 5 projects)
FC527 MW
SUN BAT5223 MW
WDS464 MW (from 3 of 4 projects)
WAT37 MW
DFO KER NG3117 MW
KER2322 MW (from 1 of 2 projects)

Top counties

CountyProjectsCapacity
New Haven654,897 MW (from 45 of 65 projects)
Fairfield637,045 MW (from 41 of 63 projects)
Hartford573,025 MW (from 53 of 57 projects)
New London438,457 MW (from 34 of 43 projects)
Windham324,382 MW (from 29 of 32 projects)
Middlesex201,780 MW (from 15 of 20 projects)
Litchfield15445 MW (from 10 of 15 projects)
NA107,760 MW (from 9 of 10 projects)
Tolland649 MW (from 5 of 6 projects)
N/A50 MW (from 1 of 5 projects)
(not published)21,100 MW (from 1 of 2 projects)
Fairfield & New Haven1not published
Ellington16 MW
Putnam12 MW
Livingston120 MW

Where each number came from

Read this before quoting a figure. We re-read every source every week, but a weekly read of an unchanged file is not weekly data. These have not moved in a while: NYISO last changed 2026-07-16 (3 identical reads since). Those rows are exactly as current as the ISO's own published file, and no more.
ISOWe last readSource last changedSource
ISO-NE2026-07-302026-07-30 (changed this snapshot)source file
NYISO2026-07-302026-07-16 (unchanged across 3 weekly reads)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.