Interconnection queue › Maine › Aroostook County
Snapshot of 2026-08-06 · 40 projects · Maine (ME)
There are 40 projects in the interconnection queue located in Aroostook County, Maine (ME), totalling 9,082 MW across the 36 that publish a capacity.
Get told what moves in Aroostook County, Maine
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Aroostook County, Maine: what entered, what moved study phase, what came off the list.
Email me Aroostook County, Maine queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 40 | 9,082 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| WND | 28 | 7,414 MW |
| N/A | 8 | 625 MW |
| SUN | 3 | 838 MW |
| SUN BAT | 1 | 205 MW |
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 40 | 9,082 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Wind | ISO-NE | 905 | not published | 5/3/2022 | 12/9/2026 |
| Wind | ISO-NE | 630 | not published | 7/26/2017 | 12/31/2022 |
| Wind | ISO-NE | 601 | not published | 6/19/2014 | 12/30/2018 |
| Wind | ISO-NE | 601 | not published | 6/19/2014 | 12/30/2019 |
| Wind | ISO-NE | 601 | not published | 4/12/2018 | 12/1/2021 |
| Wind | ISO-NE | 601 | not published | 4/12/2018 | 12/1/2021 |
| Wind | ISO-NE | 500 | not published | 1/7/2022 | 11/28/2025 |
| Wind | ISO-NE | 500 | not published | 1/10/2022 | 11/27/2026 |
| Wind | ISO-NE | 376 | not published | 12/14/2016 | 12/1/2019 |
| Expand NB/NE Interface | ISO-NE | 350 | not published | 2/16/2015 | 11/1/2017 |
| Solar | ISO-NE | 319 | not published | 5/3/2022 | 12/9/2026 |
| Solar | ISO-NE | 300 | not published | 3/31/2022 | 11/1/2026 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.