Interconnection queue › Maine › Franklin County
Franklin County, Maine Interconnection Queue
Snapshot of 2026-09-07 · 47 projects · Maine (ME)
There are 47 projects in the interconnection queue located in Franklin County, Maine (ME), totaling 3,378 MW across the 42 that publish a capacity.
Technology in Franklin County
See what moved in Franklin County, Maine each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in Franklin County, Maine, from new entries to projects that came off the list.
Email me Franklin County, Maine queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 47 | 3,378 MW |
By fuel, as published
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here. The national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| WND | 24 | 1,869 MW |
| SUN | 8 | 407 MW |
| WND BAT | 7 | 101 MW |
| (not published) | 3 | not published |
| N/A | 2 | 900 MW |
| DFO NG | 1 | not published |
| KER NG | 1 | 26 MW |
| BLQ DFO KER WDS | 1 | 75 MW |
By status, as published
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 47 | 3,378 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| 345 kV AC line from Quebec to ME | ISO-NE | 450 | not published | 7/20/2017 | 12/1/2022 |
| noncontrollable ETU from Quebec to ME | ISO-NE | 450 | not published | 4/12/2018 | 12/1/2022 |
| Wind | ISO-NE | 245 | not published | 11/3/2015 | 10/31/2019 |
| Wind | ISO-NE | 241 | not published | 4/12/2018 | 10/29/2021 |
| Wind | ISO-NE | 216 | not published | 11/3/2015 | 10/31/2019 |
| Wind | ISO-NE | 214 | not published | 4/12/2018 | 12/15/2021 |
| Wind | ISO-NE | 198 | not published | 12/22/2011 | 10/31/2016 |
| Wind | ISO-NE | 150 | not published | 7/20/2017 | 12/1/2022 |
| Wind | ISO-NE | 150 | not published | 4/12/2018 | 12/1/2022 |
| Solar | ISO-NE | 150 | not published | 4/12/2018 | 10/31/2021 |
| Wind | ISO-NE | 113 | not published | 11/3/2015 | 10/31/2019 |
| Farminton Solar | ISO-NE | 78 | not published | 8/10/2015 | 10/27/2021 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.