Interconnection queueMaine › Franklin County

Franklin County, Maine Interconnection Queue

Snapshot of 2026-08-06 · 47 projects · Maine (ME)

There are 47 projects in the interconnection queue located in Franklin County, Maine (ME), totalling 3,378 MW across the 42 that publish a capacity.

Technology in Franklin County

Get told what moves in Franklin County, Maine

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Franklin County, Maine: what entered, what moved study phase, what came off the list.

Email me Franklin County, Maine queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE473,378 MW (from 42 of 47 projects)

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
WND241,869 MW (from 23 of 24 projects)
SUN8407 MW
WND BAT7101 MW
(not published)3not published
N/A2900 MW
DFO NG1not published
KER NG126 MW
BLQ DFO KER WDS175 MW

By status, as published

StatusProjectsCapacity
(not published)473,378 MW (from 42 of 47 projects)

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
345 kV AC line from Quebec to ME
ID 661
ISO-NE450not published7/20/201712/1/2022
noncontrollable ETU from Quebec to ME
ID 743
ISO-NE450not published4/12/201812/1/2022
Wind
ID 573
ISO-NE245not published11/3/201510/31/2019
Wind
ID 745
ISO-NE241not published4/12/201810/29/2021
Wind
ID 574
ISO-NE216not published11/3/201510/31/2019
Wind
ID 746
ISO-NE214not published4/12/201812/15/2021
Wind
ID 383
ISO-NE198not published12/22/201110/31/2016
Wind
ID 662
ISO-NE150not published7/20/201712/1/2022
Wind
ID 744
ISO-NE150not published4/12/201812/1/2022
Solar
ID 749
ISO-NE150not published4/12/201810/31/2021
Wind
ID 572
ISO-NE113not published11/3/201510/31/2019
Farminton Solar
ID 557
ISO-NE78not published8/10/201510/27/2021

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.