Interconnection queue › Maine › Oxford County
Snapshot of 2026-08-06 · 36 projects · Maine (ME)
There are 36 projects in the interconnection queue located in Oxford County, Maine (ME), totalling 887 MW across the 35 that publish a capacity.
Get told what moves in Oxford County, Maine
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Oxford County, Maine: what entered, what moved study phase, what came off the list.
Email me Oxford County, Maine queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 36 | 887 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| WND | 14 | 382 MW |
| SUN | 13 | 357 MW |
| SUN BAT | 3 | 136 MW |
| NG | 2 | 0 MW |
| WAT | 2 | 1 MW |
| (not published) | 1 | 2 MW |
| WAT BAT | 1 | 8 MW |
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 36 | 887 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Solar plus Battery | ISO-NE | 129 | not published | 3/25/2022 | 12/31/2029 |
| Solar | ISO-NE | 90 | not published | 5/8/2020 | 11/22/2021 |
| Wind | ISO-NE | 80 | not published | 12/5/2011 | 10/31/2014 |
| Wind | ISO-NE | 66 | not published | 4/24/2017 | 12/31/2020 |
| Solar | ISO-NE | 65 | not published | 10/8/2020 | 10/24/2024 |
| Roxbury Solar | ISO-NE | 55 | not published | 10/22/2019 | 10/24/2024 |
| Record Hill Wind | ISO-NE | 51 | not published | 1/31/2007 | 1/31/2012 |
| Longfellow Wind | ISO-NE | 50 | not published | 5/24/2007 | 12/1/2013 |
| Swain Solar | ISO-NE | 40 | not published | 7/7/2021 | 7/9/2027 |
| Wind farm | ISO-NE | 40 | not published | 8/7/2015 | 12/1/2019 |
| Solar | ISO-NE | 35 | not published | 8/22/2019 | 12/30/2024 |
| Solar | ISO-NE | 20 | not published | 6/26/2024 | 6/6/2028 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.