Interconnection queueMaine › Oxford County

Oxford County, Maine Interconnection Queue

Snapshot of 2026-08-06 · 36 projects · Maine (ME)

There are 36 projects in the interconnection queue located in Oxford County, Maine (ME), totalling 887 MW across the 35 that publish a capacity.

Get told what moves in Oxford County, Maine

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Oxford County, Maine: what entered, what moved study phase, what came off the list.

Email me Oxford County, Maine queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE36887 MW (from 35 of 36 projects)

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.

FuelProjectsCapacity
WND14382 MW
SUN13357 MW
SUN BAT3136 MW
NG20 MW (from 1 of 2 projects)
WAT21 MW
(not published)12 MW
WAT BAT18 MW

By status, as published

StatusProjectsCapacity
(not published)36887 MW (from 35 of 36 projects)

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
Solar plus Battery
ID 1239
ISO-NE129not published3/25/202212/31/2029
Solar
ID 1026
ISO-NE90not published5/8/202011/22/2021
Wind
ID 382
ISO-NE80not published12/5/201110/31/2014
Wind
ID 641
ISO-NE66not published4/24/201712/31/2020
Solar
ID 1080
ISO-NE65not published10/8/202010/24/2024
Roxbury Solar
ID 931
ISO-NE55not published10/22/201910/24/2024
Record Hill Wind
ID 197
ISO-NE51not published1/31/20071/31/2012
Longfellow Wind
ID 215#0682ce97
ISO-NE50not published5/24/200712/1/2013
Swain Solar
ID 1146
ISO-NE40not published7/7/20217/9/2027
Wind farm
ID 555
ISO-NE40not published8/7/201512/1/2019
Solar
ID 911
ISO-NE35not published8/22/201912/30/2024
Solar
ID 1575
ISO-NE20not published6/26/20246/6/2028

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-062026-08-06 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.