Interconnection queue › New Hampshire › Coos County
Snapshot of 2026-08-06 · 32 projects · New Hampshire (NH)
There are 32 projects in the interconnection queue located in Coos County, New Hampshire (NH), totalling 956 MW across the 23 that publish a capacity.
Get told what moves in Coos County, New Hampshire
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Coos County, New Hampshire: what entered, what moved study phase, what came off the list.
Email me Coos County, New Hampshire queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 32 | 956 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| WND | 8 | 487 MW |
| WDS | 7 | 97 MW |
| SUN | 7 | 230 MW |
| N/A | 3 | 0 MW |
| (not published) | 2 | not published |
| WAT | 1 | not published |
| LFG | 1 | 6 MW |
| NG | 1 | 8 MW |
| WAT BAT | 1 | 15 MW |
| SUN BAT | 1 | 113 MW |
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 32 | 956 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Wind | ISO-NE | 180 | not published | 10/2/2008 | 9/1/2011 |
| Wind | ISO-NE | 146 | not published | 10/20/2006 | 12/30/2008 |
| Solar + Battery Storage | ISO-NE | 113 | not published | 5/13/2021 | 5/15/2025 |
| Granite Reliable Power | ISO-NE | 94 | not published | 8/9/2006 | 2/15/2012 |
| Solar | ISO-NE | 60 | not published | 6/29/2020 | 12/30/2023 |
| Solar | ISO-NE | 60 | not published | 6/29/2020 | 12/30/2023 |
| Burgess BioPower | ISO-NE | 59 | not published | 2/15/2008 | 6/17/2014 |
| Solar | ISO-NE | 45 | not published | 10/30/2019 | 10/1/2024 |
| Wind Project | ISO-NE | 34 | not published | 2/21/2007 | 11/1/2014 |
| CPD Berlin | ISO-NE | 30 | not published | 10/15/2007 | 8/31/2013 |
| Solar | ISO-NE | 20 | not published | 9/23/2021 | 11/1/2023 |
| Solar | ISO-NE | 20 | not published | 10/20/2017 | 7/1/2022 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.