New Hampshire Interconnection Queue

Snapshot of 2026-07-30 · 138 projects · ISO-NE

There are 138 projects in the interconnection queue with a New Hampshire location, totalling 11,124 MW across the 118 that publish a capacity.

Technology in New Hampshire

Get told what moves in New Hampshire

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in New Hampshire: what entered, what moved study phase, what came off the list.

Email me New Hampshire queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE13811,124 MW (from 118 of 138 projects)

By fuel, as published

Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.

FuelProjectsCapacity
SUN491,693 MW
WND23969 MW
WDS15232 MW (from 10 of 15 projects)
N/A104,690 MW (from 5 of 10 projects)
NG71,598 MW
(not published)6not published
WAT613 MW (from 5 of 6 projects)
BAT5948 MW
SUN BAT4353 MW
NUC313 MW (from 2 of 3 projects)
DFO NG20 MW (from 1 of 2 projects)
LFG27 MW
BIT222 MW
JF NG1not published
NG OTH1570 MW

Top counties

CountyProjectsCapacity
Coos32956 MW (from 23 of 32 projects)
Grafton273,187 MW
Rockingham254,626 MW (from 18 of 25 projects)
Cheshire151,097 MW (from 14 of 15 projects)
Sullivan9154 MW
Merrimack9470 MW
Hillsborough8168 MW
Strafford220 MW (from 1 of 2 projects)
Grafton/Merrimack266 MW
Merrimack/Grafton2154 MW
Belknap230 MW
Carroll2195 MW
(not published)11 MW
N/A1not published
NA1not published

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-07-302026-07-30 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.