Interconnection queue › New Hampshire › Rockingham County
Snapshot of 2026-08-06 · 25 projects · New Hampshire (NH)
There are 25 projects in the interconnection queue located in Rockingham County, New Hampshire (NH), totalling 4,626 MW across the 18 that publish a capacity.
Get told what moves in Rockingham County, New Hampshire
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Rockingham County, New Hampshire: what entered, what moved study phase, what came off the list.
Email me Rockingham County, New Hampshire queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 25 | 4,626 MW |
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here — the national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| NG | 6 | 1,590 MW |
| SUN | 4 | 130 MW |
| (not published) | 3 | not published |
| NUC | 3 | 13 MW |
| N/A | 3 | 2,290 MW |
| DFO NG | 2 | 0 MW |
| BAT | 2 | 602 MW |
| JF NG | 1 | not published |
| KER BAT | 1 | 1 MW |
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 25 | 4,626 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| HVDC/AC Tie - Import only | ISO-NE | 1,200 | not published | 2/16/2015 | 4/30/2019 |
| Northern Pass Transmission Project (300 kV HVDC/AC Tie) - Import Only | ISO-NE | 1,090 | not published | 2/16/2015 | 12/29/2022 |
| Combined Cycle Capacity Increase/ Generator Change | ISO-NE | 904 | not published | 9/5/2007 | 6/30/2013 |
| Combined Cycle( See # 226) | ISO-NE | 563 | not published | 8/3/2006 | 6/30/2013 |
| Battery Storage | ISO-NE | 402 | not published | 3/1/2023 | 11/20/2026 |
| Battery Storage | ISO-NE | 200 | not published | 9/20/2023 | 12/30/2026 |
| Solar | ISO-NE | 100 | not published | 7/25/2023 | 12/30/2028 |
| GRE Capacity Uprate | ISO-NE | 41 | not published | 11/18/2014 | 6/29/2017 |
| Combined Cycle Increase | ISO-NE | 33 | not published | 10/17/2014 | 3/8/2015 |
| Newington Gas Turbine Uprate | ISO-NE | 28 | not published | 12/4/2014 | 10/30/2015 |
| EP Newington Energy Capacity Increase | ISO-NE | 21 | not published | 3/26/2013 | 6/17/2014 |
| Seabrook LP Turbine Blade replacement | ISO-NE | 13 | not published | 10/22/2008 | 4/5/2012 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-08-06 | 2026-08-06 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.